Earthquake preparedness for a business IT team starts with an uncomfortable fact: earthquakes give no warning, and an office server room usually sits in an ordinary building designed mainly to protect people rather than equipment. A seismically engineered colocation data center with braced racks and its own backup power is built to keep systems running.
Hurricanes at least have the courtesy to show up on radar. Earthquakes skip the forecast, knock the server rack into the copier and then send aftershocks for good measure. This guide covers what quakes do to power, networks and server rooms in the parts of the US where the ground moves, and what to verify before trusting a colocation facility with your systems.
| Earthquake threat | What it does to an office server room | What a seismically engineered facility should have | Verify it by asking |
|---|---|---|---|
| Strong ground shaking | Unanchored racks slide, tip or fall | Racks and cabinets anchored and braced to the structure | Rack anchorage method and seismic cabinet ratings |
| Building damage | Building designed to code minimums for life safety, not operation | Structure designed for higher performance | Risk category, seismic design category and structural engineer of record |
| Liquefaction and ground failure | Foundation settles and utilities break | Site on stable soil or engineered foundations | Geotechnical report and site class |
| Power outages | UPS runs briefly, then the room goes dark | Anchored generators, UPS and onsite fuel | Generator anchorage, runtime and fuel contracts |
| Network outages | Single carrier circuit fails with local infrastructure | Multiple carriers with diverse paths | Carrier list and entry points |
| Aftershocks | Damaged equipment fails again during cleanup | Post-event inspection plan and staff on site | Post-earthquake inspection and staffing plan |
Where is earthquake preparedness most urgent in the US?
Almost everywhere, though some places get the headline billing. The USGS National Seismic Hazard Model released in 2024 found that nearly 75% of the US could experience damaging earthquake shaking. It also noted that 37 states have had earthquakes larger than magnitude 5 in the last 200 years. The update showed a chance of greater shaking in California and Alaska and the possibility of more damaging quakes along the central and northeastern Atlantic coastal corridor.
West Coast and Alaska
California and Alaska sit on active plate boundaries, and the USGS map paints both in the darkest colors. Alaska's magnitude 7.1 earthquake on November 30, 2018 had what USGS researchers called deep societal impacts across southcentral Alaska, even though it struck nearly 50 km below the surface.
Pacific Northwest and Cascadia
The Cascadia subduction zone is a 600-mile fault running beneath Oregon, Washington and northern California. The 2013 Oregon Resilience Plan notes that its last great earthquake, on January 26, 1700, had an estimated magnitude of 9.0. It put the odds of a Cascadia earthquake in the next 50 years at 7 to 15 percent for a great quake affecting the entire Pacific Northwest and about 37 percent for a very large one affecting southern Oregon and northern California. That is a long way from zero, which is why earthquake preparedness in Portland and Seattle deserves more than a flashlight and a hope.
Wasatch Front and New Madrid
On March 18, 2020, a magnitude 5.7 earthquake centered near Magna shook Utah's Wasatch Front. The Utah Geological Survey expects the Wasatch fault zone to produce an earthquake around magnitude 7.0 in the future, releasing about 90 times more energy than Magna. In the central US, the New Madrid seismic zone produced three earthquakes between magnitude 7 and 8 in 1811 and 1812. The USGS says many structures in Memphis, St. Louis and other communities in the central Mississippi River Valley are vulnerable to severe ground shaking.
How do earthquakes knock out power and networks?
All at once and for a long time. Shaking damages substations, transmission lines, fuel terminals and telecom buildings in the same few minutes, and each failure slows the repair of the others.
Utility restoration can take months
The Oregon Resilience Plan, prepared for the state legislature, estimates that after a Cascadia earthquake it would take one to three months to restore electricity in the Willamette Valley and three to six months on the coast. The same report notes that business continuity planning typically assumes two weeks as the longest disruption of essential services a business can withstand. Outages of a month or longer can be enough to force a business to close or relocate.
Two weeks of tolerance against three months of outage is not a gap. It is a canyon. Earthquake preparedness has to assume the grid will not be coming back on your schedule.
Fuel and telecom go down together
The plan expects widespread power outages and fuel shortages that would severely limit the operation of backup generators. It also warns that central offices and cell towers are often located on soils vulnerable to liquefaction and landslides, that many older central offices would likely fail and that cables carried on bridges are likely to be damaged or severed when bridges fail.
Your office internet depends on several of those things working. Our data center connectivity options guide explains how to buy diverse paths instead of hoping one survives.
Why do office server rooms fail in earthquakes?
Because most of the damage in earthquakes is not to the structure. FEMA's guide to nonstructural earthquake damage (FEMA E-74) notes that nonstructural failures have accounted for the majority of earthquake damage in several recent US earthquakes. That category covers equipment, ceilings, piping and contents. In other words, everything in a server room.
There is also a code problem. FEMA P-749, the agency's introduction to seismic design, says the primary objective of US building codes is preventing large-scale loss of life. Minimizing damage and preventing loss of function are not explicit objectives for buildings of typical occupancies. A code-compliant office can protect everyone inside and still end the day with its network on the floor.
Unbraced racks and loose equipment
FEMA P-749 explains that unless components are anchored or braced to the structure, shaking can make them slide or overturn, damaging the equipment or rendering the building non-functional. It adds that the inertial forces on electrical equipment can damage it even when it is properly anchored. A typical office server room has a freestanding rack, a UPS on the floor and a ceiling tile or two waiting to join the party. For most businesses, earthquake preparedness at the office stops at a strap on the water heater.
Aftershocks keep the damage coming
The USGS says most large earthquakes are followed by aftershocks, and while most are smaller than the mainshock, they can still be damaging or deadly. A small fraction of earthquakes are followed by a larger one. Aftershocks taper off with time, with about 10 times as many on the first day as on the tenth. After the 2018 Anchorage earthquake, USGS researchers estimated that the yearly chance of magnitude 5 or larger aftershocks could take hundreds to thousands of days to fall to 10%. Cleanup in a damaged room happens while the ground is still talking.
What does earthquake preparedness look like in a data center?
A seismically engineered data center attacks each of those weak points on purpose. None of it makes a building earthquake proof, and anyone who says otherwise is selling something. Ask for documents behind every claim. Our colocation buyer's guide covers the general vetting.
Building codes and risk categories
US building codes, through the IBC and the ASCE 7 standard, assign every building a risk category. FEMA P-749 describes Risk Category II as most commercial, industrial and residential buildings. Risk Category IV covers essential facilities such as hospitals, police and fire stations and emergency communications facilities, and it carries a seismic importance factor of 1.5 compared with 1.0 for Risk Category II. Buildings are also assigned a seismic design category from A to F based on expected shaking and risk category, with stricter rules at each step.
Do not assume a data center is designed as an essential facility. Ask the provider for the risk category, the seismic design category and whether the design targeted continued operation after an earthquake or life safety only.
Seismic bracing and rated cabinets
Inside the data hall, look for cabinets anchored to the floor or structure and braced overhead cable trays. Seismic cabinets are commonly tested to Telcordia GR-63-CORE, the NEBS physical protection standard, which uses shake-table testing by earthquake zone, with Zone 4 the most severe. Some facilities add seismic isolation bases or platforms under cabinets. FEMA P-749 notes that seismic isolation in new buildings has mostly been used for very important structures that must remain functional and for buildings housing valuable contents such as museums or data centers.
Generators, fuel and anchorage
A generator that walks off its pad is just a very expensive paperweight. Ask how generators, fuel tanks, UPS cabinets and battery racks are anchored. Then ask if fuel and electrical connections are designed to tolerate movement. Fuel contracts matter too, since the Oregon plan expects fuel shortages after a major quake. Our data center power redundancy guide explains what redundant power should look like.
Soil and liquefaction
The USGS describes liquefaction as loosely packed, water-logged sediments losing their strength in strong shaking. FEMA P-749 adds that structures on liquefied soils can sink and settle dramatically. The Utah Geological Survey found liquefaction was the most widely observed geologic effect of the 2020 Magna earthquake. Ask for the site's geotechnical report, its site class and whether the foundation was designed for liquefaction risk.
Why should earthquake preparedness include geographic diversity?
Because a backup site on the same fault is a second copy of the same problem. If your primary colocation facility and your disaster recovery site sit in the same metro area, one earthquake can take out both, along with the shared power grid, fuel supply and fiber routes.
Good earthquake preparedness puts disaster recovery in a region with a different seismic and utility profile. That can mean another state or a different fault system entirely. Confirm that the carrier routes between the two sites take different paths, since fiber that runs over the same bridges fails at the same time.
Why must earthquake preparedness happen before the shaking starts?
Because there is no forecast to react to. The USGS points out that earthquakes are difficult to forecast. A hurricane gives you a 48-hour watch. An earthquake gives you about as much notice as a dropped coffee.
That means the migration to colocation has to be planned and finished as normal business, not as a reaction. Carrier turn-up is often the bottleneck, and off-net builds usually take longer than buildings a carrier already serves. Order circuits early, ask each carrier for a firm order commitment (FOC) date and set the move-in date around confirmed turn-up. Our data center migration guide covers sequencing, and our hurricane preparedness guide covers the same timing problem for storm country.
Which colocation questions matter most for earthquake preparedness?
Ask for engineering documents, not adjectives.
- What risk category and seismic design category was the building designed to?
- Was the design goal continued operation or life safety only?
- How are cabinets anchored, and are seismic-rated cabinets or isolation platforms available?
- How are generators, fuel tanks, UPS and batteries anchored?
- What does the geotechnical report say about liquefaction and site class?
- How long can the generators run on stored fuel, and who supplies more?
- Which carriers serve the building, and do their routes avoid shared bridges and conduits?
- What is the post-earthquake inspection plan, and who stays on site?
- How did the facility perform in the last significant earthquake in the region?
A provider with good answers will usually hand you a binder. A provider with weak answers will hand you a brochure.
What belongs on an earthquake preparedness checklist for businesses?
- Look up your office and data center locations on the USGS hazard map.
- List every system that must survive a power outage measured in weeks.
- Check if your server room racks are anchored and if the UPS and batteries are secured.
- Find out how your current building was designed and whether its owner has a post-earthquake inspection plan.
- Ask colocation providers for risk category, seismic design category, geotechnical findings and anchorage details.
- Confirm generator runtime, fuel contracts and post-earthquake staffing.
- Place disaster recovery outside the primary site's fault system and utility region.
- Order carrier circuits early, get firm FOC dates and finish the migration as a planned project.
- Review the Ready.gov business preparedness toolkits, which include an earthquake version.
- Test failover between sites, then test it again.
Frequently asked questions about earthquake preparedness
Is any data center earthquake proof?
No. Engineering reduces damage and improves the odds of staying online, but no building is immune to a large enough earthquake nearby. Treat "earthquake proof" as a reason to ask more questions.
What seismic design should a colocation data center have?
Ask for the risk category and seismic design category, and whether the structure was designed to stay functional after an earthquake. Higher performance targets, anchored infrastructure and stable soil matter more than a marketing label.
Do I need seismic racks in a colocation facility?
In high-hazard regions it is worth asking. Many providers supply anchored cabinets, and some offer seismic-rated cabinets or isolation platforms. If you bring your own racks, confirm how they will be anchored.
How far apart should primary and disaster recovery sites be?
There is no single required distance. The goal is separation from the same fault system, power grid and fiber routes, so one earthquake cannot take out both sites.
Does earthquake insurance replace earthquake preparedness?
No. Insurance may help pay for damage after the fact, but it does not keep customers connected or systems running. Earthquake preparedness is about avoiding the outage, not just funding the recovery.
When should businesses start earthquake preparedness for a colocation move?
Now, since there is no season to plan around. Contracts, carrier orders and migrations take time. When you are ready to compare options, Get quotes lets you request quotes from facilities outside your highest-risk areas.
More in Colocation by Industry: Articles
Compare facilities: HIPAA-compliant data centers
Comparing data centers?
Send us your requirements. We'll shortlist the providers that fit and get you pricing.