- 6.8 MW critical IT
- 171,289 sq ft
- N+1 UPS
Colorado · Tier 2 market
Aurora data centers and colocation providers
Compare 3 data centers from 3 providers in Aurora.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the Aurora providers that fit.
- We negotiate, you signWe know what buyers here pay and use it to get you better terms.
- Data centers
- 3
- Providers
- 3
- Verified specs
- 3
- Carrier hotels
- 0
Top picks
Top data centers in Aurora
Ranked on verified specs, power, redundancy, connectivity and compliance, from providers we've vetted and worked with.
- SOC 1 and SOC 2 plus 2 more
- 160 MW critical IT
- SOC 1 and SOC 2 plus 2 more
Why buyers choose Aurora
Which Aurora data center fits your plan?
Most buyers pick a data center for one of three reasons. Here's what matters for each in Aurora.
Near your office
Most buyers stay within about 50 miles of HQ or a branch
2 of the 3 facilities in Aurora sell cabinets, cages and suites. Pick the easiest drive for your team. If you need to be here, ask about flood, storm and seismic design and generator fuel plans.
Close to your users
Edge and inference workloads near the people they serve
Ask which carriers and clouds are on site. Confirm density before planning GPU inference here.
Disaster recovery
A second site far enough away that one event can't hit both
Common pairings for Aurora: Dallas-Fort Worth (650 mi), Silicon Valley (940 mi) and Chicago (900 mi), each in a different state and off the same grid.
Insider advice for Aurora
- Never negotiate with one providerBring at least two competing proposals. Aurora providers price differently when they know they aren't the only option.
- Check what's already litAsk which carriers are live in the building today. Bringing in a new carrier can mean months of construction and a bill you didn't plan for.
- Get usable power in writingProviders quote breaker size. A 30A 208V circuit delivers about 5 kW under the 80% rule, so confirm usable kW per cabinet before you compare prices.
Compare all 3 facilities in Aurora
Providers
Who operates in Aurora
FAQ
Aurora colocation questions
How much does colocation cost in Aurora?
Smaller deployments usually get a standard space and power rate per cabinet. Larger ones are priced per kW of committed power, all-in, metered or with electricity passed through. Density, term and services move the price most. We'll get you current quotes for your load.
Can I deploy AI or high-density equipment in Aurora?
None of the facilities we list in Aurora publish support above 30 kW per cabinet. Most are built for standard enterprise densities. For GPU and AI deployments, we can look at providers here who will engineer higher density or at nearby markets that already support it.
What should I check about the area around Aurora data centers?
Data centers sit in industrial areas and business parks, so judge the block, not just the city. Visit at night and check lighting, parking and the walk from your car to the door. Note nearby rail lines, chemical plants, natural gas lines and flight paths. Think about your team too: drive time from your office, hotels and restaurants for long install nights and the nearest airport.
More questions? Read our colocation buyer's guide.