About Cologix COL3 Columbus
Cologix COL3 Columbus is a colocation data center operated by Cologix at 585 Scherers Court in Columbus, OH. It's one of 16 facilities we track in the Columbus market, a tier 2 market.
The building is 200,000 sq ft, with 160,000 sq ft of colocation space. UPS redundancy is 2N electrical and generators are 2N (2 x 2 MW per side). Generator runtime is 72 hours of fuel at full load. Cooling is Liebert pumped refrigerant DSE.
On-site interconnection includes Ohio IX and FD-IX Ohio. 45 carriers are available.
Worth knowing: Uptime Tier III Constructed Facility with an EF-4 tornado rating and 72 hours of fuel. Designed around 5 kW per cabinet, so ask about density before planning GPU gear.
- Industry leaders, not a call centerOur team brings 20 to 30 years from major data center platforms, the channel and data center brokerage.
- Pricing in days, not weeksOne request reaches the providers that fit. No chasing reps one by one.
- We negotiate, you signWe know what buyers in this market pay and use it to get you better terms.
Cologix COL3 Columbus key details
Cologix COL3 Columbus compliance
Cologix reports these certifications and attestations for Cologix COL3 Columbus. Ask for current reports during your evaluation.
Cologix COL3 Columbus location
- Address
- 585 Scherers Court, Columbus, OH
- Map
- View on map
Cologix COL3 Columbus specifications
Checked against Cologix’s website and spec sheet in November 2026. Where the provider’s own sources disagreed, we left the figure out rather than guess. Providers update specs on their own schedule, so we confirm the current numbers with them before you sign. SCR-DC 00047
Power
Cooling
Network
Security
Building
Is Cologix COL3 Columbus the right fit?
Our read from the published specs, plus what we'd tell you from the inside. We confirm the details with Cologix before you commit.
Where it fits
- Cabinets, cages and smaller suites, with the services a retail colocation customer expects
- Standard enterprise densities, up to 5 kW per rack
- Network-heavy workloads with 45 carriers and on-site peering at Ohio IX and FD-IX Ohio
Insider advice
- Racks top out around 5 kW. If GPUs are on your roadmap, ask what can be engineered now. Retrofitting liquid cooling later is slow and expensive.
- Ask what the whips can handle. If they're sized only for today's circuit, more power later means new whips and paying install fees again.
- Cross connects are where the margin is. Lock the monthly price per connection for the full term and every renewal.
- Visit day and night. Check lighting, parking and nearby rail, chemical plants, gas lines and flight paths.
Nearby in Columbus
Explore
Work at Cologix? Send corrections or new specs.