High density colocation exists, but far less of it is usable than the vacancy numbers suggest. North American vacancy sits near 1%, and most of what is empty is legacy product. A 30 kW or higher figure should be published, then confirmed in writing for the exact data hall you plan to rent.
Here is the short version. Space is cheap to advertise. Power and cooling at the rack are not. If you are shopping for GPU colocation, this guide shows the market data, the sites that publish a checkable number and the questions that turn a sales pitch into a spec.
Why does "yes, we have space" keep turning into "no, we can't power it"?
The call goes like this. You ask for 150 kW per rack. The rep says, "We have plenty of space." You did not ask about space.
That gap is the whole problem for any AI data center buyer, and one recent search shows it well. Metro Colo Advisory took a requirement to market for 5 MW of rack-scale GPU capacity and sent it to more than ten North American operators. Data Center Knowledge reported that nearly every operator had space and almost none could support the density. The advisor published his own account in October 2026. It was one search for one client, so treat it as a case and not a census.
Small buyers hit the same wall. One forum poster described a single AI server pulling around 3,200 W for its GPUs and asked where to rent one rack. Smaller number, same question: can you power it, cool it and say so in writing?
Industry writers call this stranded capacity. It means capacity that exists on paper but can't be used because power, cooling or distribution lags behind. A DCD opinion piece from October 2026 puts it plainly: available capacity and deployable capacity are not the same thing.
How tight is the market for high density colocation?
Tight, and the official numbers are blunt.
CBRE's H1 2026 report put primary market vacancy at a record low of 1.4%. Supply grew 33.7% in a year and vacancy still fell. About 80.4% of the capacity under construction was already preleased. Less than 1,500 MW remained, which CBRE equated to roughly six months of demand.
JLL's midyear 2026 report puts vacancy at 1% for the third year running. It expects vacancy to stay near zero through 2028. Available capacity is mostly small, fragmented blocks, and most tenants are contracting for 2028 deliveries.
Now the part that matters for GPU buyers. JLL's research lead told Data Center Knowledge that only a "very small percent" of that 1% can support high density deployments. His words on the rest: "Most vacancies are in legacy products."
Buyers who start early have options. A buyer who starts six months out gets whatever is left.
Why is so much open space built for the wrong rack?
Because the space was built for a different job. A large share of available supply is enterprise halls designed for standard workloads at low density. They were planned for racks that needed a modest breeze and a modest circuit.
We went looking for a trustworthy design density for 2000s enterprise halls and found no survey worth putting in a table. What we can source is the present day. Uptime Institute's 2025 survey report shows the average of the most common rack density at almost 9 kW, or 7.5 kW once the outliers are removed. More than 80% of operators said their facility had no racks above 30 kW. Back in 2012, an Uptime vice president called the idea that typical deployments run 10 to 20 kW per rack a myth, as reported by Cabling Installation & Maintenance.
Uptime's Daniel Bizo gave Data Center Knowledge a useful yardstick. Facilities designed over roughly the past decade were mostly built around about 20 kW per rack. They can often take 30 to 40 kW racks in limited numbers after fairly simple upgrades. Above 50 kW the picture changes.
AFCOM's 2026 State of the Data Center summary reports an average of 27 kW per rack, up from 16 the year before. That sits far above Uptime's figure. The two surveys ask different questions of different people, so don't average them. Both point up.
Picture a hall from the 2000s meeting a 120 kW rack. Nobody is being dishonest. The room is simply the wrong size for the guest.
How much power does an AI rack need?
More than most halls were ever asked to deliver. NVIDIA's own engineering blog says the GB200 NVL72 design requires 120 kW of cooling capacity per rack and uses direct liquid cooling. Schneider Electric describes a co-engineered reference design for the newer GB300 NVL72 at up to 142 kW per rack. Metro Colo Advisory cites 140 to 160 kW.
Power is only one of three gates. The Data Center POST account lists the other two:
- Where the cooling loop ends. Direct liquid cooling needs facility water at the rack row, not just at the plant room.
- Floor loading. A fully populated rack-scale system weighs about 3,000 pounds, and many raised floors were never rated for that.
Bizo adds a reality check. A deployment built around 140 to 160 kW compute racks may average about 80 kW per rack position once network and storage racks are counted. He also said 100 kW and higher racks are a bigger electrical challenge than a thermal one.
Most GPU buyers aren't buying that rack. Metro Colo Advisory notes that air-cooled GPU servers at 30 to 50 kW per rack fit a far larger share of the market than rack-scale systems do. Know your rack density before you start calling.
Air or liquid cooling: where does each one stop?
Air works longer than the hype says and stops sooner than the brochure hopes.
There is no single agreed ceiling. In AFCOM's survey, respondents were split on the density that requires liquid cooling: 20% each said 21 to 40 kW, 41 to 60 kW and 61 to 80 kW. Uptime's research blog says the industry consensus for when direct liquid cooling becomes needed or economical falls in the 20 to 30 kW range. Bizo says above 50 kW it becomes increasingly impractical to cool with air.
So here is a rule of thumb for planning. It is ours, built from the sources above, and not a standard:
- Up to about 30 kW: air cooling is the normal answer in most retail halls.
- 30 to 50 kW: air can work in the right hall. Ask for proof of cooling at that density.
- Above 50 kW: plan for rear-door heat exchangers or direct-to-chip liquid cooling and verify what is live today.
"Liquid-ready" deserves its own warning. Metro Colo Advisory found it often meant a building could support liquid cooling once equipment was bought and installed, with one operator quoting nine to twelve months for facility-side cooling gear. Liquid-ready is a plan. Liquid-cooled is a pipe with water in it.
Which high density colocation facilities publish a verified 30 kW or higher figure?
Here is the directory's own data. Of the 947 facilities in the colocationquotes.com directory, only 196 publish any per-rack density figure. Of those, 75 claim 30 kW or more per rack, and 51 were confirmed on the provider's own site or spec sheet.
Then we re-read the pages for this post, because we don't trust a number we haven't looked at. Of the 49 provider-verified rows we re-checked, 26 matched their page. The other 23 were corrected, contradicted another page from the same provider or could not be re-read, so they are not in the tables below. A further 24 listings come only from third-party sources, and we don't badge those at all.
Every figure below is quoted as the provider words it on its own facility page. See the high-density filter.
Published at sites in service or with no status noted
| Provider | Site and market | Published figure | Cooling or notes |
|---|---|---|---|
| DataBank | DFW8, Plano TX | 45 kW+ air, 100 kW+ liquid | N+1 cooling design |
| DataBank | LGA3, Orangeburg NY | 35 air, 100 liquid (page shows no unit) | N+1 cooling design |
| DataBank | SAN1, San Diego | 40 air (page shows no unit) | N+1 cooling design |
| Cologix | COL1, Columbus OH | Up to 64 kW per cabinet, 90 kW with special racks | Method not stated |
| Cologix | COL2, Columbus OH | Up to 64 kW per cabinet | Method not stated |
| Cologix | MTL8, Montréal | "Extreme density enabled, with up to 30 kW" | Build-to-suit capacity |
| Wowrack | Dallas | Up to 60 kW per rack | Air cooled, N+1 UPS |
| Netrality | KC2, Kansas City | 1 to 50 kW per cabinet | Waterless cooling; liquid and immersion can be deployed |
| Netrality | 1301 Fannin, Houston | "Power density ranges 30 kW+" | Method not stated |
| eStruxture | MTL-1 and MTL-2, Montréal | Up to 30 kW per cabinet, higher on request | MTL-2: raised floor cold air supply |
| eStruxture | CAL-1, Calgary and VAN-1, Vancouver | Up to 30 kW per cabinet, higher on request | Hot aisle and cold aisle containment at VAN-1 |
| EdgeConneX | POR02, Portland | "Capable of 30+ kW per cabinet" | Initial 3 MW N+1, 6 MW planned |
Published at sites described as new, planned or fully leased
| Provider | Site and market | Published figure | Status on the page |
|---|---|---|---|
| DataBank | DFW9 to DFW12, Red Oak TX | 45 kW+ air, 100 kW+ liquid | Future tense; rear-door heat exchangers and water-to-chip support |
| DataBank | IAD5 and IAD6, Culpeper VA | 45 kW+ air, 100 kW+ liquid | Future tense |
| DataBank | ATL5 and ATL6, Atlanta area | 30 kW+ air, 100 kW+ liquid | New campus; closed-loop chilled water |
| Cologix | COL5, Columbus OH | Load design of 5 to 100 kW per cabinet | Expected ready Q2 2027; air and liquid |
| Stream | Chicago II | Up to 60 kW per cabinet | Hyperscale product, listed as fully leased |
Three notes before you quote any of this. Several providers list one number on a spec sheet and a different one in an FAQ, so we left those sites out. A published maximum is not a promise for your hall on your date. And an empty cell here means the provider didn't say, which tells you nothing about what it can do.
Why don't more high density colocation providers publish density?
Often because they would rather not, and sometimes because they can't answer in one number. Density depends on the deal, the hall and what is built that month. A provider that keeps a kW figure off its website may deliver it happily after a call.
So non-disclosure is not incapability. It just means you can't check anything until you ask. The fix isn't to distrust the quiet ones. The fix is to ask better questions and get the answer in writing.
What should you ask any provider about high density colocation?
Use this list on every call. It works on the loud providers and the quiet ones.
- What is the sustained kW per cabinet, in writing, for the exact hall you are offering? Not the campus maximum.
- Is that air or liquid? If liquid, which kind: rear-door, direct-to-chip or immersion?
- What is live today in that hall, and what is planned? Ask for the date cooling reaches the rack row, not the building handover date.
- What cooling redundancy backs that density? N+1 on the plant is not N+1 at the row.
- What is the power redundancy to the rack? Ask about A and B feeds and the UPS design.
- What is the ramp schedule? Many operators can start a deployment. Fewer can commit to doubling it.
- What is the floor rating and rack weight limit? Ask before the rack ships.
- What does it cost per kW? Get the power, cooling and any liquid-loop charges itemized.
- What do you need to see on credit? Metro Colo Advisory reported that two operators raised tenant credit unprompted. Arrive with a parent guarantee or deposit ready. Request a quote.
How does colocationquotes.com verify a high density badge?
The badge rule is short. A facility earns it only from a provider's own spec sheet or facility page that states kW per rack. Press releases, third-party listings and sales decks don't count.
We record the exact wording, whether it says air or liquid, the cooling method if named and the date we read the page. When a provider's pages disagree with each other, the facility gets no badge until the provider clears it up. Listings from secondary sources stay unbadged and are marked as unconfirmed.
We also say what the badge does not mean. It is a published maximum. It is not a reservation, and it doesn't replace the written confirmation in the checklist above. How we verify.
High density colocation FAQs
What is high density colocation?
It is colocation space designed to power and cool racks well above the conventional range. There is no formal standard. Uptime's 2025 report treats facilities with a typical density of 30 kW or more as high density, and we use 30 kW or more per rack for our badge.
How many kW per rack counts as high density colocation?
For this directory, 30 kW or more. A rack density that high is still unusual. For context, Uptime found the average of the most common rack density at almost 9 kW in 2025. Current rack-scale AI systems sit near 120 to 160 kW.
Can air cooling handle GPU servers in high density colocation?
Sometimes, and for liquid cooling the line is blurry. Air-cooled GPU servers at 30 to 50 kW per rack fit a far larger share of the market than rack-scale systems do. Past about 50 kW, expect rear-door or direct-to-chip liquid cooling.
What is the difference between liquid-ready and liquid-cooled?
Liquid-ready means the building could support liquid cooling once equipment is installed. Liquid-cooled means facility water already reaches the rack row. Ask for the date your hall goes live.
How far ahead should I book high density colocation?
Earlier than feels reasonable. CBRE found 80.4% of capacity under construction already preleased, and JLL says tenants are contracting for 2028 deliveries. Metro Colo Advisory recommends starting twelve to eighteen months ahead.
Why doesn't every provider list kW per rack?
Density is often deal-specific and hall-specific, and some operators prefer to quote after a conversation. Silence isn't a red flag by itself. A vague answer after you ask directly is the signal worth noting. See GPU colocation providers.
More in GPU and AI Colocation Articles and Guides
Compare facilities: High-density data centers
Comparing data centers?
Send us your requirements. We'll shortlist the providers that fit and get you pricing.