Colocation Quote Comparison Calculator: Cost per Usable kW
Colocation quotes rarely line up. One quotes cabinets, another committed kW, a third adds metered power and a longer term. This puts every quote on the same basis: total cost over the term and cost per usable kW per month.
Last verified November 22, 2026
Comparison
These quotes have different terms. Cost per usable kW per month is the fair comparison, but the longer term also commits you for longer.
Why compare on cost per usable kW?
Power is what you are really buying in colocation. Space follows from it, and most providers price around it. Two quotes with the same monthly price can deliver very different amounts of power you can use, and two quotes with different prices can turn out to be the same deal once you account for the term, free months and fees.
Cost per usable kW per month puts every quote on one number. It divides everything you will pay over the term by the number of months and by the power you can run continuously. Usable means after the 80% continuous load limit and after counting a redundant A and B pair once, because the B feed is there to carry the load if A fails, not to add capacity.
Worked example: three quotes for one rack
The calculator opens with three example quotes. The numbers are illustrative, not market rates, but they show the traps.
Quote A is $1,350 a month for 36 months with a 3% annual escalator, one 208V 30A A and B pair, $1,000 setup, two cross connects at $250 a month with $250 setup each, and one remote hands hour a month at $150. One 208V 30A single-phase circuit is 6.24 kW, or 4.99 kW usable at 80%. The monthly charge rises to $1,390.50 in year two and $1,432.22 in year three, so recurring charges total about $50,073. Add $18,500 for cross connects, $5,400 for remote hands and $1,000 setup, and the total is about $74,973, or $417 per usable kW per month.
Quote B looks cheaper at $1,150 a month with a free month and $500 setup. It totals about $69,904, the lowest of the three. But it is built on 208V 20A circuits, which give only 3.33 usable kW, and its cross connects cost $300 each. Per usable kW it comes to about $583 a month, 45% more than the best quote. That is the most common trap in colocation quotes: a lower rack price with a smaller circuit.
Quote C is a 60-month term at $1,000 a month with a 4% escalator, 5 kW committed and power metered at $0.12 per kWh on an expected 3.5 kW average draw. Its total is the highest, about $120,392, because it runs nearly twice as long, yet it is the lowest per usable kW at about $401. Whether it is the best deal depends on whether you want a five-year commitment.
Why two quotes for the same MW can be very different deals
At wholesale scale, quotes are priced per kW of critical IT load per month rather than per rack, and two quotes for the same megawatts can still be far apart. Eight things usually explain the gap.
Lease structure. In a gross or all-in structure, the rate includes power and operating costs. In a modified gross structure, the rate covers space and capacity and you pay for energy separately. In a triple net structure, you also pay your share of operating costs such as taxes, insurance and maintenance. A lower headline rate on a triple net lease can cost more than a higher gross rate.
How energy is billed. Pass-through energy may be billed at the utility rate, with a markup, or multiplied by a PUE factor to recover cooling energy. At MW scale, a small change in that multiplier moves the bill by tens of thousands of dollars a month.
Deliverable versus advertised power. A quote for capacity that depends on a future utility upgrade is not the same as one for energized power. Ask for the signed utility agreement, the energization date and remedies if it slips.
Ramp and commitment. Two quotes for 5 MW can bill very differently if one charges for the full 5 MW from day one and the other ramps with your deployment.
Where the megawatts sit. Five MW in one contiguous hall is not the same as five MW split across rooms or buildings. For a GPU cluster that needs short, dense cabling between racks, split capacity can add network cost and complexity that never shows up in the rate.
What available means. Capacity can be energized and ready, inside a building still being commissioned, or in a future phase. Ask what has to happen before your equipment can run production loads, and get that date, not the building opening date, in the contract.
Room to grow. If you expect to grow from 3 MW to 8 MW over the term, a contractual right to adjacent capacity at a set price can be worth more than a lower starting rate from a provider with no room left.
Term, escalators and fit-out. Longer terms, different escalators and who pays for build-out of the suite all change the real cost. Put every quote through the same model: enter committed kW, the monthly rate, metered energy and the term here, and compare cost per usable kW per month over the full term.
What to enter for each quote
Enter the recurring charge for space and power as one monthly number, the term in months, the annual escalator and any free months. If the quote lists power as circuits, enter the number of circuits with A and B pairs counted once, plus voltage, breaker size and phase. If it lists committed kW, enter that instead and confirm with the provider that it is the usable figure.
If power is billed separately on a meter, enter the rate per kWh and your expected average draw. Add cross connects, setup per cross connect, expected remote hands hours and any other monthly fees, such as an access, cage or monitoring fee. Leave anything that does not apply at zero.
What providers quote differently
Escalators may apply to the whole bill or only to space and power. Some start in month 13, others on a calendar date. The calculator raises the recurring charge every 12 months and keeps cross connects and other fees flat, so check how each contract applies its escalator.
Committed kW can mean the breaker rating or the usable load. Metered power can include a markup or a cooling overhead factor on top of the utility rate. Cross connect pricing varies widely, and in current quotes buyers see it typically runs about $100 to $450 a month each, often with an install fee. Remote hands may be billed in 15, 30 or 60 minute increments, with higher rates after hours. Ask each provider to put these terms in writing before you compare.
What the calculator leaves out
It does not add taxes, deposits, the cost of your own equipment, carrier circuits or the cost of moving. It assumes your average draw holds steady across the term and that cross connect and fee counts stay the same. Use it to rank quotes and find the questions to ask, then confirm final numbers with each provider.
How it's calculated
- Usable kW from circuits = circuits × volts × amps × phase factor × 0.80 ÷ 1,000, counting an A and B pair once (phase factor 1, or 1.732 for three-phase)
- Recurring charges = the monthly charge for each month after any free months, raised by the escalator once a year
- Metered power = rate × average kW × 730 hours × months
- Cross connects = count × monthly charge × months, plus setup per cross connect
- Total over the term = recurring + metered power + cross connects + remote hands + other fees + setup
- Cost per usable kW per month = total ÷ months ÷ usable kW
Estimates for planning, not a quote. Contract terms and provider billing rules vary.
Common questions
How do you compare colocation quotes?
Convert each quote to total cost over the term, including escalators, free months, setup, metered power, cross connects and remote hands, then divide by months and usable kW. The lowest cost per usable kW per month is the best value for the same power.
What is usable kW?
The power you can run continuously: the circuit's kW multiplied by 0.80 for the continuous load limit, with a redundant A and B pair counted once. A 208V 30A single-phase circuit is 6.24 kW nameplate and about 4.99 kW usable.
Why is the cheapest monthly quote not always the best?
A lower price often comes with a smaller circuit, higher cross connect fees or a bigger escalator. Per usable kW, the cheaper rack can cost much more.
How do escalators change the total?
A 3% annual escalator on $1,350 a month adds about $1,473 over three years compared with a flat price. Over five years at 4% the effect compounds further, so always compare the full term.
Should I compare quotes with different terms?
Yes, on cost per usable kW per month. But a longer term also commits you for longer, so weigh flexibility and renewal terms too.
Is my data sent anywhere?
No. The calculator runs in your browser. The inputs only appear in the link if you copy it to share.
Why can two colocation quotes for the same MW cost so differently?
Differences in lease structure (gross, modified gross or triple net), how energy is billed, whether the power is energized or planned, how the commitment ramps, whether the space is contiguous, expansion rights, and the term, escalators and fit-out costs. Compare them on cost per usable kW over the full term, then weigh the terms the rate does not show.