Colocation Power Commitment and Overage Calculator
Committed power is billed whether you use it or not, and going over it can cost two to three times the base rate. This shows the balance between paying for headroom and paying for overage.
Last verified November 22, 2026
What committed power means
Many colocation contracts bill a committed amount of power, in kW, every month. You pay for the commitment whether you draw it or not. If you draw more, the contract may bill overage at a higher rate, raise your commitment to the new peak for the rest of the term, or both. Sizing the commitment is a trade-off between paying for unused headroom and paying for overage.
Worked example: 18 kW peak on a 20 kW commitment
The calculator opens with a 20 kW commitment at $180 per kW, or $3,600 a month, and an expected peak of 18 kW. With a 10% planning buffer the planned draw is 19.8 kW, which leaves only 0.2 kW of headroom, about 1%. No overage yet, but very little room.
Raise the buffer to 20% and planned draw becomes 21.6 kW, 1.6 kW over the commitment. At a $450 overage rate that is about $720 a month. The suggested commitment at a 10% buffer is 22 kW, or $3,960 a month, which costs $360 more than today but removes the overage risk.
How to pick a buffer
Use measured peaks, not averages, from your current site or PDU data. Ten percent covers normal variation. Twenty percent suits steady growth or bursty workloads such as GPU training, where draw can swing hard. If you expect a big step later in the term, negotiate a ramp: a lower commitment now with set dates to step up, rather than paying for the future load from day one.
Contract terms to check
Read how overage is measured: a single peak, a monthly average or a 95th percentile. Check whether one month over resets your commitment for the rest of the term. Ask whether the overage rate is fixed or a multiple of the base rate, whether you can lower the commitment later, and whether unused commitment can move between cabinets or sites.
Committed power is not the same as circuit capacity
Your circuits set the most you can draw. Your commitment sets what you pay for. They do not have to match. A cabinet on a 208V 30A A and B pair can carry about 4.99 kW, but you might commit only 4 kW if that is your real peak, and leave the rest as physical headroom. Some contracts tie the commitment to the circuits, so you pay for every kW the breakers allow. Others bill only the committed kW and charge overage above it. Ask which model the quote uses before you size anything, and check our power calculator for what each circuit can carry.
How it's calculated
- Committed monthly = committed kW × rate
- Planned draw = expected peak × buffer (none, 10% or 20%)
- Overage = planned draw − committed kW, when positive, × overage rate
- Suggested commitment = planned draw × 1.1, rounded up to the next kW
Estimates for planning, not a quote. Contract terms and provider billing rules vary.
Common questions
What happens if I exceed my committed power?
It depends on the contract. Some bill overage per kW, and some reset your commitment to the new peak for the rest of the term. Read the power schedule before you sign.
How much buffer should I plan for?
Ten percent covers normal variation. Use 20% if you expect growth or have bursty workloads like GPU training.
Can I lower my commitment later?
Rarely without negotiation. Ask for a rolling reset or a step-down right in the contract.
What is a power ramp in colocation?
A contract schedule that starts with a lower committed kW and steps up on set dates, so you do not pay for future load from the first month.
Is my data sent anywhere?
No. The calculator runs in your browser.
Should my commitment match my circuits?
Not necessarily. Circuits set the most you can draw, and the commitment sets what you pay for. If the contract bills only committed kW, commit to your buffered peak and keep the extra circuit capacity as headroom. If it bills by circuit, the circuits are the commitment.
How is overage usually measured?
It varies by contract. Some use the single highest reading in a month, some a monthly average and some a percentile of readings. A single-peak method is the strictest, so ask for an average or percentile if your load spikes briefly.