A GPU server built on NVIDIA Blackwell is the default AI buy for 2026 and early 2027. Most buyers choose between NVIDIA's own DGX systems and OEM HGX servers from Supermicro, Dell and HPE. Rack-scale GB300 NVL72 systems serve frontier training, while 8-GPU nodes and RTX PRO servers handle most enterprise fine-tuning and inference.
Below we compare the main systems on price signals, power, warranty and fit, then cover depreciation, renting versus buying and what a colocation site needs. Prices are dated and sourced. Where no public price exists, we say so.
| System | Vendor | GPUs | Best for | Cooling and rack power | Price signal | Warranty |
|---|---|---|---|---|---|---|
| DGX B300 | NVIDIA | 8 B300 (Blackwell Ultra) | Training, fine-tuning, large-model inference | Air, 10U, about 14 kW | No list price. 2026 reseller quotes run about $300,000 to $679,000 by support and config | 3 years Business Standard support included |
| DGX B200 | NVIDIA | 8 B200 | Training and inference | Air, 10U, about 14.3 kW max | Reported about $515,000 (July 2026) | 3 years Business Standard support included |
| GB300 NVL72 | NVIDIA, Supermicro, Dell (XE9712), HPE | 72 B300 plus 36 Grace CPUs | Frontier training, large reasoning inference | Liquid only, 132 kW nominal on the GB200 version | About $8M to $8.6M per rack (American Compute, 2026) | Varies by vendor |
| HGX B200 and B300 | Supermicro | 8 B200 or B300 | Custom training and inference fleets | 8U or 10U air, or 4U and 2-OU liquid | HGX B200 reseller listings $385,000 to $500,000 (Nov 2026) | 3 years labor, 1 year parts |
| PowerEdge XE9780 and XE9680 | Dell | 8 B300 or B200 (H100 or H200 on XE9680) | Enterprise training and inference | 10U air, XE9780L liquid | Quote only | 3 years hardware, ProSupport optional |
| ProLiant Compute XD685 and XD690 | HPE | 8 B200 or B300 | Service providers, large enterprises | XD685 5U liquid or 6U air, XD690 air | Quote only | 3 years parts, labor and onsite NBD |
| RTX PRO 6000 servers | HPE, Dell, Supermicro, Lenovo, Cisco | 2 to 8 PCIe GPUs, 96 GB each | Enterprise inference, VDI, visual AI | Air, standard racks | Quote only | Standard server warranty |
Which NVIDIA GPU server systems lead in 2026 and 2027?
NVIDIA sells its own DGX line in three sizes. DGX B200 and DGX B300 are 10U, 8-GPU servers rated at about 14 kW. The NVIDIA DGX B300 page lists it as shipping now with three years of business-standard support. The GB300 NVL72 links 72 Blackwell Ultra GPUs and 36 Grace CPUs in one liquid-cooled rack. At the other end, DGX Station puts a GB300 desktop superchip with 748 GB of coherent memory beside a developer's desk. Dell said on March 16, 2026 that it was the first OEM to ship one, as the Dell Pro Max with GB300.
Rubin is next. NVIDIA said on its November 18, 2026 earnings call that Vera Rubin production shipments began in August and that it remains on track to launch Vera Rubin Ultra in 2027. The 144-GPU Kyber rack planned for Rubin Ultra was reported in July 2026 to be slipping to 2028, though NVIDIA said its roadmap is intact. For most enterprises, Rubin capacity in 2027 will come first through cloud and neocloud contracts, so a Blackwell GPU server remains the practical on-premises buy.
How do DGX and OEM HGX GPU server builds differ?
HGX is the 8-GPU baseboard NVIDIA sells to server makers. DGX is NVIDIA's own fixed build around that board. An OEM HGX GPU server lets you pick the CPU, memory, storage, NICs and cooling, while DGX ships one configuration with NVIDIA's software stack and support.
Supermicro
Supermicro began volume shipments of HGX B300 systems and GB300 NVL72 racks on September 11, 2025. It offers 8U air-cooled B300 nodes, 4U liquid-cooled nodes with its DLC-2 stack and a 2-OU ORv3 design that fits up to 144 B300 GPUs in one rack. Air-cooled HGX B200 systems fit up to four per rack. StorageReview spent a week with an X14 HGX B200 system in its Supermicro JumpStart review in November 2025 and noted that vLLM did not yet seem fully optimized for Blackwell.
Dell PowerEdge XE
The Dell PowerEdge XE9780 takes eight B300 or B200 GPUs in an air-cooled chassis, with a liquid-cooled XE9780L. The XE9680 still covers H100 and H200 builds. Dell shipped the first GB300 NVL72 racks, built on PowerEdge XE9712, in July 2025. The XE8712, a liquid-cooled GB200 NVL4 sled that fits up to 144 GPUs per IR7000 rack, became available in December 2025.
HPE ProLiant Compute XD and GB300 NVL72
HPE's XD685 takes eight NVIDIA or AMD GPUs, and its liquid-cooled B300 version reached general availability in January 2026. The air-cooled HPE Compute XD690 with eight B300 GPUs arrived in October 2025. NVIDIA GB300 NVL72 by HPE opened for orders in October 2025 with shipping expected that December.
RTX PRO 6000 servers for enterprise inference
Not every AI job needs SXM GPUs. RTX PRO 6000 Blackwell Server Edition cards carry 96 GB of GDDR7 and slot into standard air-cooled servers such as the HPE DL380a Gen12, Lenovo SR650a V4 and Cisco C845A M8. HPE says this pairing delivers three times better price-to-performance than H100 for enterprise AI, measured in NVFP4 against FP8.
Lenovo and Cisco
Lenovo sells HGX and RTX PRO systems in its ThinkSystem line. Cisco sells the C845A M8 for two to eight RTX PRO GPUs, and since October 2026 Cisco has resold Supermicro rack-scale NVIDIA systems. See our enterprise server lines guide for the wider server market.
How much does a GPU server cost?
NVIDIA does not publish DGX list prices, so every figure here is reported or posted by a reseller.
- 8-GPU HGX B200. Reseller listings ran $385,000 to $500,000 in November 2026, and one market tracker put a typical integrated quote near $450,000 in July 2026.
- DGX B200. The same tracker reported about $515,000.
- DGX B300. Reseller quotes in 2026 mostly fall between $300,000 and $500,000, and one US reseller posted $678,950 with three years of support in November 2026.
- NVL72 racks. HSBC estimated about $2.6 million for a GB200 NVL72 and $3 million for a GB300 NVL72, as reported by Barron's in August 2025. Prices have climbed since, and financing firm American Compute now puts a GB300 NVL72 rack at roughly $8 million to $8.6 million.
Low supply and high demand have pushed GPU server prices up through 2026, so expect some quotes above these ranges. These prices exclude the network fabric, storage, power and space. Our colocation pricing guide covers the facility side.
What do reviewers and buyers report?
Hands-on tests back up the spec sheets. In its October 2025 review, ServeTheHome measured an air-cooled HGX B200 GPU server at about 2.9 kW idle and just over 12.5 kW under maximum load, with GPU results in line with reference B200 numbers. StorageReview's tests showed strong GPUDirect Storage throughput and noted that inference software was still catching up to Blackwell.
What buyers commonly report:
- Allocation matters more than list price. Buyers with partner relationships see quotes near list, while others wait or pay more.
- DGX buys simplicity. Buyers who pick DGX value one support contract and a tested software stack.
- OEM builds buy choice. Supermicro, Dell and HPE let buyers pick Intel or AMD CPUs, air or liquid cooling and their own NICs.
- Facilities are the real bottleneck. Many projects stall on power and cooling readiness, not on the servers themselves.
How long does a GPU server last and how fast does it depreciate?
Hyperscalers depreciate servers over five to six years. Amazon went the other way and cut a subset of its servers and networking gear from six years to five starting January 1, 2025. It cited the faster pace of AI technology, and its filing says the change added $1.4 billion of depreciation in 2025. Meta moved most servers to 5.5 years the same year. Investor Michael Burry argued in November 2025 that the real useful life of AI servers is closer to two to three years, as CNBC reported.
Physical life and economic life are different things. A GPU server can run for many years, but each new generation cuts the cost per token, so older hardware loses rental and resale value well before it fails. Resale data shows both effects. Financing firm American Compute valued a used 8-GPU HGX H100 node at about $195,000 in August 2026, roughly 58% of its estimate of the original price. Its forecast bands assume much steeper declines from here. NVIDIA support entitlements are also non-transferable, which affects what a second owner gets.
Should you rent GPUs or buy a GPU server?
The GPU Rental Price Index averaged these on-demand rates across more than a dozen providers from November 1 to 25, 2026.
- H100 at $3.52 per GPU-hour, with the cheapest listings from $1.80
- H200 at $5.04, from $3.20
- B200 at $8.41, from $5.00
Break-even math is simple. A $450,000 HGX B200 system equals eight B200s rented at $8.41, or $67.28 an hour, for about 6,700 hours. That is roughly nine months at full use or 18 months at 50% use, before power, space, networking and staff. Against the cheapest $5.00 listings, break-even stretches to about 15 months at full use. Owning wins when utilization stays high for years. Renting wins for bursty work or when Rubin may change your plans. Our top neocloud companies roundup lists the GPU clouds.
Which GPU server fits training and which fits inference?
- Frontier training. GB300 NVL72 racks or large clusters of HGX B300 nodes on InfiniBand or high-speed Ethernet fabrics.
- Fine-tuning and mid-size training. A single DGX or HGX B200 or B300 node, or a small cluster.
- High-volume inference. HGX B200 nodes are easier to source than B300, and NVL72 racks suit large reasoning models.
- Enterprise inference and VDI. RTX PRO 6000 servers in standard air-cooled racks.
What warranty and support come with a GPU server?
- NVIDIA DGX. Three years of Enterprise Business Standard support is included. It covers local business hours, a four-business-hour first response on severity 1 cases and next-business-day advanced RMA with an onsite engineer. Business Critical adds 24/7 coverage and a one-hour response.
- Dell. XE servers carry a three-year hardware warranty that excludes software support. ProSupport and ProSupport Plus add software help, and a Keep Your GPU option lets you retain failed parts.
- HPE. The XD685 includes three years of parts, labor and onsite support with next-business-day response. HPE's NVL72 terms acknowledge requests next business day but handle diagnostics and part shipments on a best-effort basis.
- Supermicro. GPU systems get three years of labor, one year of parts and one year of advance cross-shipment.
How does Supermicro compare with NVIDIA DGX?
- Price. Reported OEM HGX B200 quotes sit below DGX B200 estimates, though discounts vary by deal.
- Lead time. Both depend on GPU allocation. Supermicro claims volume shipments of Blackwell Ultra since September 2025, but confirm dates in writing.
- Flexibility. Supermicro offers Intel or AMD CPUs, more storage and NIC choices and air, liquid or ORv3 chassis. DGX is one fixed build.
- Support. DGX includes three years of NVIDIA support. Supermicro covers parts for one year, so many buyers add an extended plan or keep spares.
- Liquid cooling. Supermicro sells liquid-cooled nodes and racks with its own CDUs. DGX B200 and B300 are air-cooled nodes, and NVL72 is liquid for every vendor.
What does a GPU server need from a colocation facility?
An air-cooled 8-GPU node draws about 12.5 to 14.3 kW, so four of them need roughly 50 to 57 kW per rack. That is several times the 11 kW average rack in Uptime Institute's 2026 survey. HPE rates the GB200 NVL72 rack at 132 kW nominal and tells sites to provision busways for about 192 kW peak. The rack weighs 3,245 lb and needs a coolant distribution unit, so check floor loading, rigging paths and freight elevators. Supermicro offers a 250 kW liquid-to-liquid CDU or a 200 kW liquid-to-air sidecar for sites without facility water. Read our liquid cooling guide and the 2027 data center growth outlook, then plan lead times for power and cooling as carefully as for the servers.
Questions to ask before you buy a GPU server
- What is the confirmed ship date for this exact configuration?
- How long is the quote valid?
- Which support tier is included, and is it transferable?
- What is the measured peak power per node?
- Who swaps failed GPUs, and how fast?
- Can the vendor deliver racks integrated and tested?
GPU server buying checklist
- Match the workload to node or rack scale.
- Model rent against buy at realistic utilization.
- Confirm power per rack, cooling type and floor rating with your colo.
- Budget for networking, storage and support.
- Plan depreciation over three to five years.
- Get colocation pricing through our quote request.
Frequently asked questions about GPU server options
What is the difference between DGX and HGX?
HGX is NVIDIA's 8-GPU baseboard that OEMs build servers around. DGX is NVIDIA's own fixed system on that board, sold with NVIDIA support.
How much does an 8-GPU server cost?
November 2026 reseller listings put an HGX B200 system at $385,000 to $500,000, depending on configuration.
How much power does a GPU server use?
An air-cooled 8-GPU Blackwell node draws about 12.5 to 14.3 kW at peak. An NVL72 rack is rated at 132 kW nominal.
How long does a GPU server last?
Hyperscalers use five to six year schedules, but economic life is often shorter because each generation cuts the cost per token.
Is it cheaper to rent or buy?
Buying pays off at high utilization over about one to two years. Renting suits bursty or short projects.
When will Rubin servers be available?
Vera Rubin began production shipments in August 2026, mostly to large cloud buyers. NVIDIA targets Vera Rubin Ultra for 2027.
More in Data Center Hardware Articles and Guides
Compare facilities: High-density data centers
Comparing data centers?
Send us your requirements. We'll shortlist the providers that fit and get you pricing.