Liquid and Direct-to-Chip Cooling for Colocation Buyers

Data center liquid cooling for colocation explained. Direct-to-chip basics, ASHRAE guidance, NRCs, who owns what, risks and the SLA terms AI buyers need.

12 min read

Last verified November 21, 2026

Data center liquid cooling moves heat from chips into a fluid instead of room air, which lets colocation racks run far denser than air allows. For AI buyers it adds pieces to negotiate, including coolant distribution units, a secondary loop, install charges, a responsibility split and an SLA that covers water.

It's the question every AI buyer asks right now. It is also the question that makes a sales engineer's smile freeze slightly, because the honest answer is "it depends" followed by forty minutes on water chemistry. Data center liquid cooling is complex. This guide breaks it into pieces small enough to put in a contract, and maybe even small enough to explain to finance.

Cooling option Typical density (sourced) Who owns what Maturity in colo
Air (room units and containment) Under 20 kW per rack in some chilled-water rooms; impractical above about 50 kW Provider owns the whole system Standard everywhere
Rear-door heat exchanger A traditional door adds about 10 kW per rack of cooling capacity Provider supplies water; door ownership varies Offered at some facilities, not all
Direct-to-chip single-phase 60 to 80 kW racks in a DOE lab; 120 kW for one GPU rack design Provider owns facility water; CDU and rack loop split varies Water cold plates named by 41% of colo DLC users and considerers
Direct-to-chip two-phase No neutral range published Usually customer and integrator, with provider heat rejection Named by 31% of colo DLC users and considerers
Immersion No neutral range published Customer owns tanks and fluid; provider supplies power and heat rejection Full immersion named by 9% to 14%

The colo maturity shares come from Uptime Institute's 2026 cooling survey and reflect organizations using or considering direct liquid cooling in leased colocation space (n=80). Respondents could pick more than one type.

Why do AI racks need data center liquid cooling?

Because the racks got hot and air ran out of room. Uptime Institute's 2025 survey put the average typical rack at almost 9 kW, and more than 80% of operators had no racks above 30 kW at all. Meanwhile, one GPU vendor's published rack-scale design calls for 120 kW of cooling capacity per rack, using direct liquid cooling.

Air has limits. ASHRAE's TC 9.9 white paper on liquid cooling notes that a 40 to 50 kW rack could need up to 5,000 cfm of airflow, while a best-in-class floor tile delivers about 1,900 cfm. An Open Compute Project paper found that chilled-water rooms using room units with no aisle arrangement top out under 20 kW per rack on the air side. An Uptime analyst, quoted by Data Center Knowledge, said that above 50 kW it becomes increasingly impractical to cool with air.

Liquid carries far more heat per unit of volume, so it can handle what air cannot. That is why data center liquid cooling moved from supercomputing labs into colocation conversations. Uptime's 2026 cooling survey summary found that 17% of operators now use direct liquid cooling in leased colocation space, up from 13% in 2025.

How does direct-to-chip cooling work?

Direct-to-chip cooling attaches metal cold plates to the hottest components. Those are usually GPUs and CPUs. Coolant is pumped through each plate. The warm coolant carries heat out of the server to a heat exchanger, where a second loop takes it away to the building's heat rejection plant.

Cold plates and manifolds

Each cold plate sits on a chip like a heat sink with plumbing. Hoses connect the server to a rack manifold, which distributes coolant to every server in the rack. Quick disconnects let technicians remove a server without draining the loop, which is the part everyone hopes works exactly as advertised.

Coolant distribution units

The coolant distribution unit (CDU) is the heart of the system. It pumps coolant, controls temperature and pressure, filters the fluid and isolates the server loop from the building's water. Open Compute Project guidance describes three types. In-rack CDUs serve a single rack. Row-level CDUs serve several racks. Facility-level CDUs serve every liquid-cooled rack in a hall. The type you get shapes cost, redundancy and who maintains what.

Facility water and the technology cooling system

There are two loops, and the difference matters for your contract. The facility water system (FWS) is the building loop that carries heat from the CDU to chillers, cooling towers or dry coolers. The technology cooling system (TCS) is the closed loop between the CDU and the cold plates in your servers. The two exchange heat inside the CDU but never mix. OCP guidance notes that separating them limits the impact of potential leaks because the TCS holds less liquid at lower pressure and flow.

The heat that still needs air

Direct-to-chip does not remove every watt. In what OCP calls a "hybrid basic" design, cold plates cool the CPUs and GPUs while air still cools memory, storage, networking and power components. So a liquid-cooled rack still needs some room air, and the provider still needs to deliver it within the right temperature range.

What does ASHRAE say about data center liquid cooling?

ASHRAE Technical Committee 9.9 publishes the guidance most of the industry follows on data center liquid cooling. The full guidelines are paid publications, so here is what its public white paper on liquid cooling covers.

Water temperature classes

ASHRAE groups liquid cooling by the upper limit of the facility supply water temperature in degrees Celsius. The classes are W17, W27, W32, W40, W45 and W+. All carry a lower limit of 2°C. Warmer water classes can save energy because the plant may not need mechanical chillers. ASHRAE also warns that future, higher-powered chips may need cooler water than today's hardware, so facilities should plan for that. Ask your provider which W class each hall supports, and confirm your hardware maker's requirements match.

Water quality and filtration

The TCS needs much cleaner fluid than building water. OCP's cloud-scale TCS guidance says TCS systems require filtration down to 25 µm, which is very difficult to achieve with job-site construction. OCP's guidelines for propylene glycol coolant note that most CDUs contain 25 or 50 µm inline filters. They also strongly recommend sidestream filtration for systems with more than 250 gallons of fluid. The same guidelines set limits for water used to dilute the coolant, including bacteria below 100 CFU/mL. ASHRAE calls water quality and maintenance "an issue of great concern." The takeaway for buyers is simple. Someone has to test the fluid, change filters and keep records. Find out who.

What does data center liquid cooling cost in colocation?

There is no neutral published price list, and anyone quoting a universal per-kW number is guessing. Uptime's 2026 survey found cost was the top barrier to direct liquid cooling, cited by 41% of respondents. ASHRAE notes there is a rack density at which liquid cooling has a lower first cost than air cooling the same load. Here is where the money goes.

One-time charges

Expect nonrecurring charges (NRCs) or customer-paid equipment for some or all of these:

  • CDUs, whether in-rack, in-row or shared facility units.
  • Piping, valves and manifolds from the facility loop to your racks.
  • Secondary loop installation and pressure testing.
  • Flushing, fluid fill and initial fluid testing.
  • Leak detection sensors, drip trays and alarms.
  • Commissioning and documentation.

OCP's coolant guidelines devote a full section to cleaning, flushing and start-up, which tells you how much work it is. Ask for each item to be listed separately on the quote, along with who owns the equipment when the term ends.

Monthly charges

Monthly charges for data center liquid cooling often follow power, typically a rate per kW. Some providers may add a cooling surcharge for liquid-cooled capacity or charge separately for CDU maintenance, fluid testing and filter changes. Our colocation quote guide covers how to compare those lines, and our rack power guide covers power for dense racks.

Who is responsible for what in data center liquid cooling?

This is where most of the complexity lives. Draw the line between the provider and you before you sign, not after the first alarm. Data center liquid cooling has more handoffs than air, and every handoff is a place for a ticket to bounce. The natural boundary is the CDU, because that is where the facility loop ends and your loop begins. But CDU ownership, maintenance, fluid quality and leak response can fall on either side.

Get a written responsibility matrix, often called a RACI. RACI stands for responsible, accountable, consulted and informed. It should list every component and task.

Example responsibility matrix

This is an example for illustration only. Real splits vary by provider and deployment.

Component or task Provider Customer Notes
Facility water supply temperature and flow Responsible Informed Defined in the SLA
Heat rejection plant Responsible Informed Chillers, towers or dry coolers
CDU supply and ownership Varies Varies Write it down
CDU maintenance and filter changes Responsible Consulted If provider-owned
TCS fluid testing and records Responsible or shared Consulted Agree on frequency and limits
Rack manifolds and quick disconnects Consulted Responsible Usually part of the rack
Cold plates and server internals Informed Responsible Tied to hardware warranty
Leak detection monitoring Responsible Informed Alarms go to both
Leak response and cleanup Responsible Consulted Agree on response times
Server-side shutdown during a leak Consulted Responsible Your runbook

Hardware warranties deserve special attention. Your server maker may specify approved coolants, filtration levels and temperature ranges. Make sure the provider's loop meets them in writing.

What are the risks of data center liquid cooling in colocation?

None of these are reasons to avoid data center liquid cooling. They are reasons to ask good questions.

  • Leaks. Liquid near electronics needs leak detection, drip trays and a response plan. OCP's guidance describes leak detection and drip trays as common practice.
  • Water quality. Poor chemistry can cause corrosion, scale or biological growth that clogs cold plates. OCP's coolant guidelines cover corrosion types and bacteria limits.
  • Pressure and flow. Each added server, hose and quick disconnect adds pressure drop. The CDU has to be sized for the whole loop.
  • Single points of failure. One CDU serving many racks is a single point of failure unless it has N+1 redundancy. Ask how pumps, heat exchangers and controls are made redundant.
  • Mixed air and liquid halls. Uptime notes many installs share heat transport and rejection with air systems, which can compromise efficiency gains.
  • Retrofits. ASHRAE notes high-density racks can quickly use any remaining capacity of existing air handlers. It also says floor loading limits can leave older halls with more empty space than expected.
  • Lead times. CDUs, prefabricated piping and specialty parts may take time to arrive. Ask for realistic dates.
  • Vendor compatibility. Quick disconnects, fluids and wetted materials must work together. Mixing parts from different makers needs checking.
  • Warranty. Running outside your hardware maker's fluid or temperature specs could create warranty problems. Confirm before you fill.

What should a data center liquid cooling SLA cover?

Most colocation SLAs were written for power and room air. In one major provider's standard agreement we reviewed for an earlier guide, SLAs covered power plus room temperature and humidity, and the provider did not commit to temperatures inside cabinets. ASHRAE also notes that some colocation SLAs have been written to exclude water near racks altogether. So ask what a liquid SLA would cover. Here is what to request.

  1. Supply temperature. A committed range at the CDU or rack inlet, tied to an ASHRAE W class.
  2. Flow rate. Minimum flow per rack or per CDU.
  3. Pressure. Maximum and minimum operating pressure.
  4. Cooling loop uptime. Availability of the liquid cooling system, separate from power.
  5. Water quality parameters. Testing frequency, limits and how results are shared.
  6. Response times. How quickly the provider responds to leaks, alarms and CDU faults.
  7. Credits. How credits are calculated for each item and whether they are capped. Credits are usually a slice of one month's charge, so focus on prevention and response.

Our colocation agreement guide covers SLA and credit language in more detail.

What questions should you ask a provider about liquid cooling?

  1. Which halls support direct-to-chip today, and at what kW per rack?
  2. What ASHRAE W class does the facility water support?
  3. Are CDUs in-rack, in-row or facility level? Who owns them?
  4. What redundancy do the CDUs and pumps have?
  5. Where exactly is the demarcation between facility water and my loop?
  6. Who tests the fluid, how often and against what limits?
  7. Who changes filters and keeps maintenance records?
  8. What leak detection is installed, and who responds?
  9. How much air cooling is available for the heat that cold plates do not capture?
  10. Which one-time charges apply, and who owns the equipment at term end?
  11. How are monthly charges structured for liquid-cooled capacity?
  12. What does the SLA cover for temperature, flow, pressure and uptime?
  13. Will you meet my hardware maker's coolant and temperature specs in writing?
  14. What are the lead times for CDUs and piping?

Planning a first AI deployment? Our GPU colocation guide covers sizing a proof of concept.

What belongs on your data center liquid cooling checklist?

  • Confirm kW per rack and cooling method for each hall.
  • Get the supported ASHRAE W class in writing.
  • Choose in-rack, in-row or facility CDUs.
  • Confirm CDU redundancy, N+1 or better.
  • Define the FWS and TCS demarcation point.
  • Sign a responsibility matrix covering every component.
  • List all one-time charges separately.
  • Confirm monthly pricing and any cooling surcharges.
  • Agree on fluid type, testing frequency and limits.
  • Assign filter changes and maintenance records.
  • Confirm leak detection, alarms and response times.
  • Confirm air cooling capacity for residual heat.
  • Match the loop to your hardware maker's warranty specs.
  • Get SLA terms for temperature, flow, pressure and uptime.
  • Confirm lead times for CDUs and piping.
  • Review move-in steps with our colocation requirements guide.
  • Compare liquid-ready facilities with get quotes.

Our free data center checklist adds these liquid cooling checks to a full facility scorecard. Our AI and high-density colocation checklist goes deeper on GPU deployments.

Frequently asked questions about data center liquid cooling

Is data center liquid cooling available in colocation today?

Yes, but not everywhere. Data center liquid cooling is still the exception in leased space. Uptime's 2026 survey found 17% of operators use direct liquid cooling in leased colocation space. Availability varies by facility and hall.

What is the difference between direct-to-chip and immersion cooling?

Direct-to-chip pumps coolant through cold plates on the hottest components. Immersion submerges entire servers in a dielectric fluid inside a tank.

Who pays for the CDU?

It depends on the provider. Some include CDUs in the service, some charge an NRC and some expect the customer to buy them. Get it in writing.

Can an older data hall be retrofitted for liquid cooling?

Sometimes. It depends on facility water availability, piping routes, floor loading and remaining air capacity. Ask for a site-specific assessment.

Does liquid cooling void server warranties?

Not by itself, but running outside your hardware maker's specs for fluid, filtration or temperature could cause problems. Confirm the specs before filling the loop.

What water temperature does direct-to-chip need?

It depends on the hardware and the ASHRAE W class it supports, from W17 to W+. Check the hardware maker's requirements and match them to the facility.

More in Data Center Cooling Articles and Guides

Compare facilities: High-density data centers

Related

Comparing data centers?

Send us your requirements. We'll shortlist the providers that fit and get you pricing.