Get Quotes
  1. Blog
  2. Contracts

What You Need to Get a Colocation Quote and Move In

Colocation requirements from quote to move in. See what providers ask for, from business name and credit check to insurance, MSA, access list and shipping.

10 min read

Last verified November 21, 2026

Colocation requirements fall into three stages. To get a quote you need your location, space, power, redundancy, connectivity, term and timeline. To sign you need a business name, tax ID, sometimes a credit check or deposit, proof of insurance and a signed MSA. To move in you need an access list, equipment plan and shipping schedule.

None of this is hard. It just tends to arrive all at once, usually the week you hoped to be racking servers. The insurance certificate is with a broker who is on vacation, the access list has one name on it and the shipment is sitting on a loading dock with a label that says "Server stuff." This guide lays out every item in order so move-in day is boring, which is the highest compliment a data center can receive.

Requirement When it's needed Small vs large deals
Location, space, power and term Quote Same for everyone, but larger deals need more detail on growth
Business name and tax ID Contract Expected at almost every size, even for a sole proprietor or LLC
Credit check Contract Not always for small retail deals; a bigger conversation at 250 kW and up
Deposit or prepayment Contract First month and one-time charges are common upfront asks
Signed MSA, service order and SLA Contract Small deals sign standard forms; large deals negotiate
Certificate of insurance Contract or move-in Required at most sizes; limits and wording vary
Main point of contact and escalation list Contract Same for everyone
Authorized access list with photo ID Move-in Same process, longer list for larger teams
Equipment list and power plan Quote and move-in Detail grows with density and rack count
Carrier orders and LOAs Move-in More circuits and cross connects on larger deals
Shipping and receiving plan Move-in Larger deals may need staging space and dock time
Facility rules and acceptable use Move-in Same for everyone

What are the colocation requirements to get a quote?

An accurate quote needs real numbers. Vague requests get vague pricing, and vague pricing tends to grow once the contract shows up. Before you ask for a quote, gather these details.

  1. Location. The metro or specific facilities you want, and any distance limits from your office or users.
  2. Space. Rack units, half rack, full racks or a cage.
  3. Power. Expected kW per rack, circuit size and voltage. Our rack power guide explains how circuits translate to usable kW.
  4. Redundancy. Single circuits or A and B feeds.
  5. Connectivity. Carriers you already use, bandwidth needs and cross connects. See our data center connectivity options guide.
  6. Term. One, three or five years. Note how much you expect to grow.
  7. Timeline. When you need to be live, and any hard deadlines such as a lease ending or hardware arriving.

With those details, every provider prices the same thing. That makes quotes easy to compare fairly. Our colocation quote guide covers what to look for once quotes arrive.

What colocation requirements apply before you sign?

Once you pick a provider, the paperwork starts. Most colocation requirements at this stage are standard. Some of it depends on your company's size and history.

A business name and tax ID

Most colocation providers expect a business name on the contract, even if that business is a sole proprietor or a single-member LLC. Expect to share your tax ID, usually an employer identification number. The IRS describes an EIN as a federal tax ID number for businesses and says you can get one free directly from the IRS. Going the other way, your accounts payable team will likely want the provider's Form W-9 to set them up as a vendor.

A credit check, sometimes

Some providers run a business credit check and some do not. Smaller retail deals often skip it or keep it light. One data center operator's master agreement filed with the SEC says services are provisioned following credit approval and receipt of any required security deposit. If your company is new, expect questions about funding or ownership.

Deposits and prepayment

The same agreement makes one-time installation and setup fees, the first month's charges and any security deposit due when the service order is signed. It also says the deposit is credited back to your account when service ends. Ask how much is due upfront, which payment methods are accepted and who your billing contact should be.

A personal guarantee for some new businesses

Occasionally a provider asks the owner of a new or small business to personally guarantee payment. One small provider's published colocation agreement included that language. It is not universal, but if you see it, understand what you are signing and ask whether a deposit or prepayment could replace it.

The MSA, service order and SLA

You will sign a master services agreement (MSA) and a service order that lists your specific services, prices and term. You will also acknowledge the service level agreement (SLA), which defines uptime commitments and credits. Smaller deals usually sign the provider's standard forms. Read them anyway. Our colocation agreement guide walks through the clauses that matter.

Proof of commercial insurance

Expect to provide a certificate of insurance. One large provider's published service terms require commercial general liability of at least $1,000,000 per occurrence and all-risk property insurance covering the replacement cost of your equipment. The provider must also be named as an additional insured on most coverages, and certificates are due when the agreement is signed. The provider's own insurance does not cover your equipment. Send the requirements to your insurance broker early, because certificates with specific wording can take a few days.

Billing details and sales tax certificates

Give the provider a billing contact, billing address and any purchase order numbers your finance team needs. If your organization is exempt from sales tax or holds a certificate that applies, send it before the first invoice. Fixing tax on invoices after the fact is nobody's idea of fun.

How do colocation requirements change with deal size?

The bigger the commitment, the more the provider wants to know about you. Colocation requirements scale with the risk the provider takes on.

Retail deals up to a couple hundred kW

Retail colocation covers deals up to a couple hundred kW, from a few rack units to several racks or a small cage. Requirements are usually standard. That means a business name, tax ID, contact details, insurance certificate and signed forms. A credit check may or may not happen, and terms are mostly the provider's standard paper.

Larger deals at 250 kW and up

Once a deal reaches 250 kW, 500 kW or more, credit becomes a much bigger conversation. Expect deeper financial review, larger deposits or other security and more negotiation on contract terms. The provider is committing real capacity for years, and it wants confidence you will be there to pay for it.

Are colocation requirements easier at regional providers?

Often, yes. Smaller regional providers are more likely to work with new businesses and with smaller projects such as home labs, test environments and proof-of-concept deployments. Larger operators tend to be stricter about credit history, minimum commitments and paperwork. Neither approach is wrong. They just suit different buyers. If you are a new company, ask early what a provider needs from you. A five-minute question can save a two-week credit review that ends in a polite no. If you have a short operating history, offering a larger deposit or prepayment can sometimes help. Our regional vs global colocation providers guide compares the two in more detail.

What colocation requirements come before move-in day?

Signing the contract is not the finish line. The facility still needs to know who is coming, what is arriving and how it plugs in. These colocation requirements are where most move-in delays start.

Main point of contact and escalation list

Name one main point of contact for the account, plus technical and billing contacts. Add an escalation list with phone numbers so the facility knows who to call at 3 a.m. if something goes wrong. Keep it current. A contact list full of former employees is a special kind of outage.

Authorized access list and photo ID

Providers only let pre-approved people into the facility. One large provider's service terms limit the access list to 10 people, all 18 or older. Expect visitors to show government-issued photo ID and be checked against the list. Add backups so a single sick day does not lock you out.

Equipment list and power plan

List every device you plan to install with rack units, power draw, plug types and network ports. Match it to your circuits so you do not discover on install day that your PDU plugs do not fit the receptacles. Some agreements can start billing even if your power configuration is late. One major provider's standard form allowed billing if the customer had not provided final power configuration within 10 business days of signing.

Network orders and LOAs

Order carrier circuits early, since they often take the longest. A letter of authorization (LOA) lets a carrier or another party connect to your space for a cross connect. The same major provider's form set a 30 business day deadline for customers to provide the LOA for ordered cross connects. Track every circuit order and LOA in one place.

Shipping and receiving

Ask about receiving hours, inbound labeling rules and how long the facility will store boxes. One large provider requires shipments to be scheduled at least five business days ahead with written confirmation. Unscheduled shipments may be rejected and returned at the customer's cost. Label every box with your company name, ticket number and destination cage or rack.

Facility rules and acceptable use

You will likely sign or acknowledge a customer handbook, facility rules and an acceptable use policy. Common rules cover photography, escorts, tailgating, food and drink and cardboard on the data floor. Read them before your team shows up with a pizza and a camera.

Install date and orientation

Schedule your install date with the facility, book any remote hands help you need and plan for orientation or badging on the first visit. If the provider is installing equipment for you, confirm the scope in writing and deliver everything on time.

What belongs on a colocation requirements checklist?

Print this, tape it to a wall and check items off as you go. It covers colocation requirements from the first quote request to the first powered-on server. If an item does not apply to your deal, cross it off with confidence rather than guilt.

Before you request a quote

  • Choose target metros or facilities.
  • Estimate space in rack units, racks or cage size.
  • Estimate kW per rack and circuit size.
  • Decide on single or A and B power.
  • List carriers, bandwidth and cross connects.
  • Pick a term length and expected growth.
  • Set your go-live date and hard deadlines.

Before you sign

  • Confirm your legal business name and tax ID.
  • Ask if a credit check is required.
  • Confirm deposit, prepayment and payment method.
  • Ask about any personal guarantee and alternatives.
  • Read the MSA, service order and SLA.
  • Send insurance requirements to your broker.
  • Provide the certificate of insurance with the required wording.
  • Name billing contacts and send any tax exemption certificate.
  • Request the provider's W-9 for accounts payable.

Before move-in day

  • Name a main point of contact and escalation list.
  • Submit the authorized access list.
  • Confirm everyone has government-issued photo ID.
  • Finalize the equipment list and power plan.
  • Confirm plug types match receptacles.
  • Order carrier circuits and send LOAs.
  • Schedule inbound shipments and confirm receiving hours.
  • Label every box with company name, ticket and destination.
  • Review facility rules and acceptable use policy.
  • Book the install date, orientation and any remote hands.

Ready to start? Get quotes.

Frequently asked questions about colocation requirements

Do I need a business to get colocation?

Most providers expect a business name, even a sole proprietor or LLC. Some agreements also allow individuals, so ask the provider directly.

Do colocation providers run credit checks?

Some do and some do not. Small retail deals may skip it, while deals at 250 kW and up usually involve a deeper credit review.

What insurance do colocation requirements usually include?

Commonly general liability and property insurance for your own equipment, with the provider named as an additional insured. Exact limits vary, so get the provider's requirements in writing.

Can a home lab meet colocation requirements?

Often, at the right provider. Smaller regional providers are more likely to work with home labs, test environments and proof-of-concept projects.

What is an LOA for a cross connect?

It is a letter of authorization that lets a carrier or partner connect to your space. Providers often set deadlines for submitting it after you order.

Can I ship equipment before move-in?

Usually, if you schedule it. Some providers require several business days' notice and may reject unscheduled shipments.

More in Colocation Pricing and Contract Articles

Compare facilities: Retail colocation data centers

Related

Comparing data centers?

Send us your requirements. We'll shortlist the providers that fit and get you pricing.