Get Quotes
  1. Resources
  2. Templates
  3. Colocation SLA Template

Colocation SLA Template (Free PDF)

A sample colocation service level agreement written from scratch after reviewing public provider SLAs. It shows what a strong SLA commits to, how credits are calculated and where the fine print usually hides.

Last verified November 22, 2026

Download the PDF PDF · 7 pages · free, no email required

What's in the colocation SLA template

  • A checklist of 12 things to check in any data center SLA
  • A downtime table for 99.9% to 100% availability
  • Power, environmental, network, cross connect, support and security commitments with credit tables
  • Maintenance limits, exclusions, credit claims, caps, reporting and a chronic-failure exit
  • Optional latency and packet loss targets for network services

What a colocation SLA should commit to

A colocation SLA covers the things the provider controls: power to your cabinet, cooling within an agreed temperature and humidity range, physical security and, if sold, network uptime. Each commitment should name a measurable target, where and how it is measured, the credit for missing it and the process to claim it. Power availability is usually the core promise, and the strongest SLAs commit to power on both feeds of a redundant pair, not just one.

How to read an availability percentage

Availability percentages hide very different amounts of downtime. Over a 30-day month, 99.9% allows about 43 minutes of downtime, 99.99% about 4.3 minutes and 99.999% about 26 seconds. A 100% power SLA usually means any loss of power to a properly connected redundant pair earns a credit. Ask how the percentage is calculated, over what period, and whether maintenance windows count.

Credits, caps and claims

Credits are usually a percentage of the monthly charge for the affected service, rising with the length of the outage, and capped at a share of the month's fee. Check what the credit is based on: the whole cabinet charge or one line item. Check the claim deadline, since some SLAs require a claim within days. And check whether credits are your only remedy, or whether repeated failures let you terminate without a fee.

Environmental and response commitments

For cooling, the SLA should name the temperature and humidity range and where it is measured, usually at the cold aisle inlet. Current ASHRAE guidance recommends 64.4°F to 80.6°F for most IT equipment. For support, look for response times for remote hands and for notifying you of incidents, and a commitment to share a root cause report after a major outage.

What to check before you sign a data center SLA

Redundant power

A 100% promise that pays nothing when one feed fails. Dual-cord your critical gear.

Measurement point

Power or temperature measured somewhere other than your cabinet.

Maintenance

Unlimited excluded hours, or maintenance minutes removed before availability is calculated.

Claim deadline

Ten business days or less, sometimes only with a ticket opened during the outage.

Credit cap

Credits capped at a fraction of one month, and only on the power line.

Sole remedy

Credits as your only remedy for everything. Limit it to the outage itself.

The PDF covers each of these in full.

About this colocation SLA template

A data center SLA, or service level agreement, is the schedule in a colocation contract that sets measurable commitments for power, cooling, network, support and security, and the service credits you receive when the provider misses them. Most buyers sign it without running a single outage through the credit table.

This sample SLA was written from scratch after we compared public SLAs from several colocation providers. It includes credit tables you can adjust, an alternative credit model, maintenance limits, a short exclusion list and a chronic-failure exit, so you can see what a strong SLA looks like before you read your provider's.

How to use the colocation SLA template

  1. Read the checklist on page one before you open the provider's contract.
  2. Compare the provider's clauses against the template and mark the gaps.
  3. Send your requested changes as a redline and get the final terms in writing.
  4. Have counsel review the final documents before you sign.

A sample for reference and planning, not legal advice. Your provider's signed paper controls.

Common questions

What is a data center SLA?

It is the part of a colocation contract that sets measurable commitments for power, environment, network, security and support, and the service credits you receive when the provider misses them.

What uptime should a colocation SLA promise?

Redundant A+B power is commonly committed at 100% and single circuits at 99.99%, which allows about 4.32 minutes of downtime in a 30-day month.

Do SLA credits cover business losses?

Usually not. Credits are commonly the sole remedy for missing the service level, and master agreements usually waive lost profits. That is why the template limits sole remedy to the outage itself.

Is this SLA template based on a real provider's SLA?

No. We compared several public provider SLAs to see what is standard, then wrote the template from scratch. No provider names or wording are used.

How do I claim an SLA credit?

Open a ticket during the outage, then submit a written claim within the SLA's window with the date, time and services affected. The template asks the provider to issue credits automatically.