A data center SLA is the part of your colocation contract that sets measurable service promises and what you get when the provider misses them. It usually covers power, temperature, humidity, network, security and support. The remedy is almost always a service credit on your bill, not a refund of your losses.
Everyone loves a big uptime number. "100% power availability" looks great on a slide. Then the lights flicker, you open the contract and discover the promise covers one feed of two, measured at a receptacle under the floor, with credits you must request in writing inside 30 days. This guide walks through what a colocation SLA covers, how the math works and where the fine print hides. We also built a sanitized example colocation SLA, free to download in the download section below.
| SLA component | What it covers | Typical commitment framing | How it is measured | What the credit looks like | What to watch for |
|---|---|---|---|---|---|
| Redundant power (A+B) | Power to your space on two feeds | 100% availability | Monthly, from provider logs and tickets | Sliding percent of the affected power MRC | Both feeds must fail. Your gear must be dual-corded |
| Single circuit power | One feed | 99.99% in one form we read | Monthly | Smaller or no credit for short misses | Overloaded breakers void the credit |
| Temperature | Room or cold aisle air | ASHRAE allowable range or a stated range in °F | In the room, not in your cabinet | Flat, hourly or daily credit | No commitment inside cabinets |
| Humidity | Room moisture | Dew point or relative humidity range | In the room | Flat percent or a daily credit | Same in-cabinet carve-out |
| Network or blended IP | Internet you buy from the provider | 99.99% with redundant ports | Minutes available over the month | Percent of the network charge per incident, capped | No SLA for single ports |
| Cross connects | Repair of a failed cross connect | Fix and fee waiver in some forms | Ticket based | The cross connect fee for the month | Install intervals often missing |
| Remote hands and support | Response to your tickets | Acknowledge or respond within a set window | Ticket timestamps | Small percent per delay | Response is not resolution |
| Physical security | Unauthorized access to your space | Access monitored and restricted | Incident based | Up to 50% of MRC in one form | You must lock your own space |
| Maintenance | Planned and emergency work | Excluded with advance notice | Notice timestamps | None | Monthly caps on excluded hours |
What is a data center SLA in a colocation contract?
A data center SLA is a schedule or exhibit that attaches to your master services agreement. The MSA sets the legal rules. The order form sets price, term and what you bought. The SLA sets the performance promises and the remedy. The public forms we read tie the SLA to the MSA, so the SLA does not stand alone. If the MSA says credits are your only remedy, that language controls even when the SLA looks generous. Our colocation agreement guide covers how the three documents fit together.
An SLA is also not a Tier rating. A Tier describes how a facility's infrastructure is designed and built. Uptime Institute's Tier page explains the four Tier levels, and Uptime has said even a fault tolerant site can have outages if it is not operated well. Your data center SLA is the only document that commits a provider to a number with a remedy attached. See our data center tiers guide for the difference.
What does a colocation data center SLA usually cover?
The colocation SLAs we read cover the facility, not your equipment. The big buckets are power, environment, network, security and support.
Power availability per circuit and on A+B feeds
Power is the heart of any data center SLA. One large provider's public schedule promises 100% availability for redundant power and 99.99% for non-redundant power, measured over the calendar month. Another provider's 2026 SLA guarantees 100% with an A/B configuration and 99.99% for an A feed alone. That same SLA says no credit is issued for the failure of one side of an A+B configuration.
Translation: if only your A feed drops, the provider met its redundant SLA, because B kept running. That works only if your servers have two power supplies plugged into both feeds and each feed can carry the full load. Single-corded gear on an A+B setup gets the marketing without the protection. Our data center power redundancy guide explains how to set up A+B correctly.
Temperature and humidity
Environmental SLAs vary more than power SLAs. Here is what three public forms say:
- One large provider maintains the space to ASHRAE TC 9.9 allowable standards for temperature and dew point and "does not commit to any temperature range inside cabinets."
- A second provider targets 64 to 78°F supply air and 40% to 60% relative humidity, excluding localized conditions in a customer's space.
- A third commits to an average of 65 to 78°F over 24 hours in the cold aisles, with no guarantee inside cabinets.
ASHRAE's recommended range for air-cooled IT equipment tops out at 27°C (80.6°F), according to its 2021 liquid cooling white paper. Where the sensor sits matters as much as the range. A cold aisle reading tells you little about the top of a 30 kW rack with blanking panels missing.
Network and blended IP
If you buy internet bandwidth from the provider, the data center SLA may cover it. One provider's network schedule offers 99.99% availability for redundant services and says plainly that it provides no SLA for single port solutions. Credits there are 10% of the affected network charge per incident, up to 30% a month. If you bring your own carriers, their SLAs are separate contracts.
Cross connects, remote hands and support
Cross connect SLAs, when they exist, usually cover repairs rather than install speed. One SLA waives the cross connect fee for the month if it fails because of an internal fault. None of the public SLAs we read committed to an install interval, so ask for one in the order form if your migration depends on it.
Support SLAs usually measure acknowledgment or response. One provider commits to acknowledge daytime tickets within 12 hours and respond to emergency hotline calls within one hour, with a 2% credit per 30 minutes of delay. Response is not resolution. A technician arriving on time to stare at your dead server does not fix it. Our remote hands vs smart hands guide covers what remote hands can actually do.
Security and maintenance windows
Some SLAs include physical security. One promises monitored and restricted access and credits 50% of the month's MRC for unauthorized access, provided you secured your own space. Maintenance shows up mainly as an exclusion. One large provider excludes scheduled maintenance announced 48 hours ahead, up to eight hours a month. It also excludes emergency maintenance announced 60 minutes ahead, up to two hours a month.
How much downtime does a data center SLA percentage allow?
Percentages hide minutes. Here is the math for a 30-day month (43,200 minutes) and a 365-day year (525,600 minutes).
| Availability | Downtime per 30-day month | Downtime per year |
|---|---|---|
| 99.9% | 43.2 minutes | 8.76 hours |
| 99.95% | 21.6 minutes | 4.38 hours |
| 99.99% | 4.32 minutes | 52.56 minutes |
| 99.999% | About 26 seconds | 5.26 minutes |
| 100% | Zero | Zero |
A 31-day month gives slightly more room, about 4.46 minutes at 99.99%. Also note that most SLAs measure monthly, so a bad month cannot be averaged away by a good year. The 99.671% to 99.995% figures that float around next to Tier levels are not part of Uptime's Tier Standard, so do not treat them as SLA commitments.
How do SLA service credits work?
Credits are a percentage of what you pay, applied to a future bill. The details decide whether they are meaningful.
Credits are a percent of MRC
Here is the same one-hour outage under three public forms. In a 30-day month, a one-hour outage leaves 99.86% availability.
- Form A. On redundant power, 99.86% falls in the 50% band, so you get half of that month's charge for the affected power service.
- Form B. The credit is 2% of MRC for 43 to 432 minutes of downtime, rising in steps to a 50% maximum.
- Form C. For A+B power, 5 to 120 minutes of unavailability earns 25% of monthly power fees.
Same outage, very different checks. Always run your own scenario through the actual table.
Caps, claim windows and sole remedy
The forms we read cap credits. One form caps total credits at 100% of the affected service's MRC for the month. Another caps all credits at the month's MRC. Claim windows are short. One large provider requires a written request within 30 days of month end and says late requests forfeit the credit. Another requires notice within 10 days.
Then comes the sentence that matters most. Credits are typically your "sole and exclusive remedy" for the failure. Combined with a mutual waiver of consequential damages in the MSA, that means a credit worth a slice of one month's power charge may be all you get for an outage that cost your business far more.
Chronic outage termination rights
The public forms we read did not include a chronic outage exit. One law firm article suggests negotiating one, for example the right to terminate without penalty if availability falls below the commitment in three months out of any twelve. Without it, repeated small failures can leave you collecting coupons while staying locked into the term.
What should you watch out for in a data center SLA?
Here is where the fine print usually hides in a data center SLA:
- Single-corded equipment. Redundant power SLAs may not pay when only one side fails.
- Scheduled maintenance. Announced maintenance is usually excluded. Check the notice period and the monthly cap.
- Force majeure and broad exclusions. Some forms exclude any event not wholly within the provider's control.
- Customer-caused outages. Overloading a circuit voids the credit. One form names exceeding 80% of a breaker's rating. Another names exceeding your kW commitment.
- Measurement point. One SLA stops at the power receptacle under the floor. Another excludes failures of your rack PDU.
- Who measures. Several SLAs we read rely on the provider's own logs and tickets, sometimes "as determined by" the provider.
- Credit request deadlines. Miss the window and the credit is gone.
- Credits capped at the affected service. A power outage may only credit the power charge, not your space or cross connects.
- Default status. Some forms deny credits while your account is past due or in default.
- One-sided changes. One public SLA lets the provider modify it at any time with notice.
- No consequential damages. Lost revenue is usually waived in the MSA.
Does a 100% SLA mean zero downtime?
No. A 100% SLA means any downtime triggers a credit, not that downtime cannot happen. One form promises "commercially reasonable efforts" to deliver 100% power. Treat 100% as the trigger point for a remedy, not a law of physics.
How do you negotiate a better data center SLA?
Based on what buyers commonly see, the credit table is harder to move than the terms around it. Focus your asks where providers have more room:
- A longer claim window, or proactive credits. One public SLA commits to issue credits within five business days without a request.
- A written incident report. One SLA commits to a reason for outage within five business days.
- A chronic outage exit with no termination fee.
- Credits on the full MRC of affected services, not just the power line.
- Clear measurement points and access to monitoring data.
- Tighter maintenance caps and longer notice.
- A cross connect install interval in the order form.
Bring these asks to every quote so you compare like for like. Our how to read a colocation quote guide shows where SLA terms hide in a proposal, and you can get quotes to compare providers side by side.
Where can you download a sanitized example colocation SLA?
Our colocation SLA template is a sanitized example with provider names removed. It shows a power credit table, environmental commitments, exclusions and claim terms so you can see how the pieces read together.
Use it to know what to look for, not as a contract. Your provider's actual paper always controls.
What belongs on a data center SLA checklist?
- SLA attached to the MSA and referenced in the order form
- Power commitment for each circuit type (single and A+B)
- All critical equipment dual-corded across A and B
- Temperature and humidity ranges and where they are measured
- Network SLA terms if you buy bandwidth, including redundancy rules
- Cross connect repair terms and install interval
- Remote hands and support response windows
- Maintenance notice periods and monthly caps
- Full list of exclusions read and understood
- Credit table run against a one-hour and four-hour outage
- Credit cap and which charges it applies to
- Claim deadline on your calendar
- Sole remedy and consequential damages language reviewed
- Chronic outage exit requested
Frequently asked questions about data center SLAs
What is a data center SLA?
It is the part of a colocation contract that sets measurable service commitments for power, environment, network, security and support, along with the credits you receive when the provider misses them.
Is 99.99% uptime good for colocation?
It allows about 4.32 minutes of downtime in a 30-day month. Two public forms we read use it for single circuit power and commit redundant A+B power at 100%.
Do SLA credits cover my business losses?
Usually not. Credits are commonly the sole and exclusive remedy, and most MSAs waive consequential damages such as lost revenue.
How do I claim an SLA credit?
Follow the SLA's process exactly. That often means a written request with outage details within a set window, such as 30 days after month end. Open a ticket during the outage so there is a record.
Does a Tier III facility guarantee uptime?
No. A Tier rating describes infrastructure design and construction. Only the data center SLA in your contract commits the provider to an availability number and a remedy.
Why does my SLA exclude single-corded equipment?
A redundant power SLA promises that at least one feed stays up. Equipment with one power supply cannot use the second feed, so a single-side failure takes it down even though the provider met its commitment.
More in Colocation Pricing and Contract Articles
Compare facilities: Retail colocation data centers
Comparing data centers?
Send us your requirements. We'll shortlist the providers that fit and get you pricing.