Data Center Checklist (Free PDF)

A side-by-side scoring checklist for evaluating colocation providers and facilities. Score three providers on 90 items across 15 sections, then weight what matters to your deployment, from compliance to GPU density and liquid cooling.

Last verified November 22, 2026

Download the PDF Excel scorecard 10-page PDF and Excel workbook · free, no email required

What's in the data center checklist

  • Red flags, documents to request and site tour questions on page one
  • 90 scored items across 15 sections, with columns for three providers
  • A high-density section on kW per cabinet, liquid cooling, CDUs, facility water, floor loading and power ramps
  • Compliance items updated for ISO/IEC 27001:2022, PCI DSS v4.0.1, SOC reports, HITRUST, HIPAA and TIA-942-C
  • A weighted scorecard to total each provider
  • A free Excel scorecard that averages each section, applies your weights, totals each provider out of 300 and stops any provider with a red flag

Worked example: scoring three providers

Say you are evaluating three facilities for a 200 kW deployment. You weight power at 13 and network at 10 out of 100, as in the default scorecard. Provider A averages 2.8 on power and 2.0 on network. Provider B averages 2.2 on power and 2.9 on network. Power contributes 36.4 points for A and 28.6 for B, network 20 for A and 29 for B. Repeat across all 15 sections and each provider gets a total out of 300.

The totals tell you who fits best on paper. The red flags tell you who to rule out. A provider with the highest total but an expired compliance report or capacity with no energization date is still a no until that changes. The free Excel scorecard does the averaging, weighting and red flag check for you.

How to verify scores

Score from evidence. Compliance items need reports dated within the last year that name the facility. Power and cooling items need the provider's written design and recent test records. Capacity needs an energization date and, for planned power, a signed utility agreement. High-density items need a live deployment you can see. Anything you cannot verify gets a zero until it is proven.

Red flags that should stop a data center deal

Paper capacity

Power marketed as available with no utility agreement or energization date.

Stale compliance

Reports that are old, cover another facility or arrive only as logos.

Design-only Tier claims

No certification of the constructed facility.

Liquid cooling on request

No live liquid-cooled deployment you can see.

Delivery path

A route from the dock that cannot fit or carry your racks.

Early billing

Billing that starts before your space is accepted.

The PDF covers each of these in full.

About this data center checklist

A data center checklist keeps a site selection honest. Every provider's tour sounds good, so the checklist turns claims into scores you can compare: whether capacity is energized, whether compliance reports are current and name the facility, whether liquid cooling runs today, and whether your racks fit through the door.

We built this checklist from scratch after reviewing evaluation checklists published by colocation providers and equipment makers, then updated it for 2026. It reflects current standards, including ISO/IEC 27001:2022, PCI DSS v4.0.1 and ANSI/TIA-942-C, and adds a full section for neoclouds and other high-density buyers on rack density, liquid cooling, CDUs and floor loading.

How to use the data center checklist

  1. Shortlist two or three providers and write one in each column.
  2. Score each item from 0 to 3 from documents and the tour, not the sales deck.
  3. Weight the sections for your deployment and total each provider.
  4. Treat any red flag as a stop, whatever the total, then compare contract terms with our SLA and MSA templates.

A sample for reference and planning, not legal advice. Your provider's signed paper controls.

Common questions

What should a data center checklist include?

Location risk, building and delivery path, power, cooling, high-density and liquid cooling, network, security, fire protection, compliance, operations, SLA and contract terms, growth, efficiency and the provider's own strength.

Which compliance reports should a colocation provider have?

Most buyers ask for a current SOC 2 Type II report naming the facility, a SOC 1 Type II, an ISO/IEC 27001:2022 certificate and a PCI DSS v4.0.1 attestation. Healthcare buyers often add a business associate agreement and HITRUST.

What should neoclouds check in a data center?

Maximum kW per cabinet with air and liquid cooling, whether liquid cooling is live today, who owns the CDUs and secondary loop, facility water temperature and flow, floor loading for rack-scale systems and a power ramp with contractual dates.

How do I compare data center providers fairly?

Score every provider on the same items from documents and site tours, weight the sections for your needs, and treat red flags as deal breakers regardless of the total.

Is ISO 27001:2013 still valid?

No. ISO/IEC 27001:2013 certificates expired or were withdrawn by October 31, 2025. Ask for a 2022 certificate.