Neocloud colocation deals get done when the buyer shows up prepared. A provider wants to know your cluster size, rack density and cooling method, how you will pay for the build and who backs the contract. Bring financials, funding proof and customer contracts. Verify that the capacity is energized, and expect deposits, a long term and real NRC.
Look, we get it. We have worked these deals from the provider side of the table. We have also watched a neocloud team walk in with a clean spec sheet, audited numbers and answers to every question before we asked them. That deal moved. The team with a pitch deck and a dream got a polite email and a longer wait. Here is what providers weigh so you can be the first team.
| Deployment unit | What it is | Power and cooling picture | What it means for your colo ask |
|---|---|---|---|
| GPU node | One 8-GPU server, such as a DGX B200 system | Up to 14.3 kW max per system, 10 rack units, air cooled | Two per rack is already about 28.6 kW |
| Air-cooled GPU rack | A few 8-GPU servers plus networking | Buyers commonly see 15 to 40 kW per rack in quotes | Well above the typical rack of almost 9 kW |
| Rack-scale system | A 72-GPU liquid-cooled rack such as GB200 NVL72 | 120 kW of cooling capacity per rack, direct liquid cooling | Needs facility water, CDUs and heavy power at the rack |
| Pod | Roughly 1,000 GPUs | About 1.7 to 1.8 MW by our math, before networking and storage | A dedicated room or a large block of a hall |
| Cluster | Several pods | Multiple MW, usually delivered in phases | A ramp schedule, utility proof and a serious credit conversation |
What does a neocloud actually need from colocation?
A neocloud rents GPU compute to AI builders, which means your product is somebody else's training run. Every week your GPUs sit in a warehouse is depreciation with no revenue. So the neocloud colocation question is rarely "is there space?" It is "is there powered, cooled space I can occupy on a date I can promise my own customers?"
Demand is real. JLL's North America Data Center Report for midyear 2026 puts neoclouds at 11% of 2026 tenant demand, second only to hyperscalers. It says JLL has identified more than 5 GW of neocloud capacity online or being developed in North America. The same report puts vacancy at about 1% and says most tenants securing space today are contracting for 2028 deliveries. Translation for your board deck. You are competing for a scarce product and the provider gets to be picky.
How big are neocloud clusters and nodes?
Providers think in kW per rack and MW per hall, so do your math in those units before the first call.
The 8-GPU node
The workhorse is the 8-GPU server. NVIDIA's user guide for the DGX B200 lists 14.3 kW maximum power for the system, in 10 rack units, fed by six 3.3 kW power supplies. Put two in a rack and you are near 28.6 kW before switches. Uptime Institute's 2025 survey put the typical rack at almost 9 kW, so a single GPU rack can draw what three ordinary racks do.
The rack-scale system
NVIDIA's description of its GB200 NVL72 contribution to the Open Compute Project lists 72 GPUs, 18 compute trays and nine switch trays, a bus bar rated for 1,400 amps and 120 kW of cooling capacity per rack handled with direct liquid cooling. That is not a rack you drop into a hall built for 8 kW and a hopeful fan.
Pods and clusters
About 1,000 GPUs as 8-GPU servers is 125 systems, or roughly 1.8 MW at maximum draw. The same 1,000 or so GPUs as 14 rack-scale systems is about 1.7 MW of cooling capacity. Add storage, networking and cooling overhead and a "small" neocloud pod becomes a multi-MW room. Your cluster plan should show each phase in kW, the go-live date for each and what happens if your hardware ships late.
Why does power density change the neocloud colocation conversation?
Density decides which buildings are even eligible. A hall designed for low single-digit kW per rack can have plenty of floor space and no way to deliver 40 kW or 120 kW to a cabinet. Floor loading, busway or whip capacity and redundancy design all matter. Ask how power reaches the rack and at what voltage. Ask how many feeds you get and whether redundancy is N+1 or 2N. A neocloud that knows its per-rack kW, feed count and redundancy level shortens scoping from weeks to days. See our GPU colocation guide.
What cooling should a neocloud expect?
Air cooling still handles many 8-GPU servers at moderate density. Past that, liquid takes over. Rack-scale systems are designed around direct-to-chip liquid cooling, which brings coolant distribution units, facility water loops, filtration, leak detection and a responsibility matrix into your deal.
Decide early who owns what. Who buys the CDUs? Who maintains the secondary loop? Who is liable if a quick disconnect weeps onto a tray worth more than a house? One major provider's standard SLA we reviewed covered power and room conditions with no commitment inside the cabinet, so read the cooling language closely. We cover the technical side in our data center liquid cooling guide.
What is fake capacity and how does a neocloud spot it?
Fake capacity is space marketed as available that is not energized, not cooled or not backed by a utility commitment. It is a rendering with a megawatt number on it. Sometimes it is real capacity promised to three tenants at once.
The utility world has its own version of this problem. Utility Dive reported that AEP Ohio cut its large load forecast from 30 GW to 13 GW through a new data center tariff, and an Ohio manufacturers group called the earlier numbers "paper demand." The tariff approved by Ohio regulators in July 2025, as described by POWER magazine, requires large new data center loads to pay for at least 85% of subscribed capacity for up to 12 years, with exit fees and financial assurance. Utilities are now asking data center developers for skin in the game, and those costs flow downstream to tenants.
How to separate real capacity from paper capacity:
- Utility proof. Ask for a signed electric service agreement or a utility letter that states the MW and the energization date. A "we are in discussions" email is not proof.
- Energization status. Ask whether the substation and feeders are built, under construction or still on a planning map.
- Ready-for-service date. Get a contractual date for each phase, not a target in a slide.
- Delivery remedies. Ask for rent abatement or credits if the provider misses the date, plus a termination right if it misses an outside date.
- Site walk. If the hall is "ready," you should be able to stand in it. Hard hats are fine. Dirt is not.
Why does investment grade credit matter so much?
Investment grade means a credit rating of BBB- or higher from S&P and Fitch, or Baa3 or higher from Moody's. Most neocloud operators are young, fast growing and unrated, which puts them in the non-investment grade bucket by default. That is not an insult. It is how lenders sort risk.
Here is why your provider cares. Large builds are financed against tenant contracts. JLL notes that top-tier credit hyperscalers get the most efficient construction loan pricing, while non-credit tenant deals are evaluated case by case based on tenant profile, credit support from the off-taker and location. JLL puts spreads on that non-credit profile about 200 to 300 basis points wider than investment grade construction loans, with lower loan-to-cost limits. Your credit directly changes the provider's cost of building your hall. That is why a neocloud gets asked harder questions than a household-name tech company asking for the same MW.
How do IG-backed credit wrappers work for a neocloud?
A credit wrapper puts a stronger balance sheet behind your lease. The common forms we see discussed:
- Parent or sponsor guarantee. A parent company or major investor guarantees the payments. It only helps if the guarantor's credit is stronger than yours.
- Standby letter of credit. A bank promises to pay the provider if you do not. The bank will want collateral or a credit line, so it ties up capital.
- Customer contract backing. Your own long-term contract with an investment grade customer supports the deal. Providers look at its term, its termination rights and whether it can be assigned as security.
- Vendor or financier support. Some deals include backing from hardware vendors or financing partners. Read exactly what is promised.
The challenges are practical. Guarantors want caps and expiry dates. Letters of credit cost fees and eat liquidity. Customer contracts often end before the colo term does, or let the customer leave for convenience, which leaves the provider holding the gap.
What do neocloud colocation NRC and MRC look like?
NRC, the one-time charges, covers work done for your deployment. In a high-density deal that can include power distribution, liquid cooling infrastructure, cage and containment build, cross connects and commissioning. When the provider builds something specific to your hardware, expect more of that cost up front or a longer term to recover it.
MRC, the monthly recurring charge, is usually driven by committed power. In high-density deals the commitment is often measured in kW or MW, and you may pay for reserved capacity whether or not you draw it, which mirrors how those utility tariffs work. Read our how to read a colocation quote guide for the line-by-line view.
We are not going to quote market prices for neocloud deployments here. Prices move fast and depend heavily on market, density and credit. Any number we printed would be wrong by the time you read it.
What contract terms should a neocloud negotiate?
Terms are where the money lives. Focus on these:
- Term length. A provider building for you wants a term long enough to recover its capital. Ask what a shorter term costs, not whether it is allowed.
- Ramp schedule. Commit power in phases that match GPU deliveries. A ramp that starts billing full MW on day one is a cash flow problem waiting to happen.
- Billing start. Some standard agreements we have reviewed start billing on the delivery date whether or not you are ready to move in. Tie it to the ready-for-service date.
- Early termination. Early termination fees can equal the remaining monthly charges. Model that number before you sign.
- Assignment and change of control. Negotiate the right to assign the contract to an acquirer or affiliate with equal or better credit.
- Expansion and ROFR. Get rights to adjacent capacity so your next pod does not land three states away.
Our colocation agreement guide covers the clauses in more detail.
Why do providers ask for deposits upfront?
Deposits are the provider's insurance against the risk it cannot diversify away. When a provider spends real money building for one tenant, it wants some of that money at signing. Expect some combination of a security deposit, prepaid MRC, NRC due at signing and in some deals a letter of credit. One provider agreement we reviewed required NRCs, the first month and any security deposit at signing, with service following credit approval.
The size usually tracks your credit and how custom the build is. A neocloud with strong financials, an investment grade customer contract and a standard hall design should ask for lower deposits or a step-down schedule. For example, a deposit that shrinks after a year of on-time payment. A team with no audited numbers should expect the opposite. See our colocation requirements guide for the full paperwork list.
What worries providers most about neocloud tenants?
We will say the quiet part out loud. Many in the industry think a given neocloud may go out of business or get bought. It is not personal. It is vacancy. A provider that built a liquid-cooled hall for one tenant does not have a long line of replacements ready to take that exact space if the tenant disappears or stops honoring the contract.
Acquisition worries providers too. A buyer may consolidate sites, renegotiate or try to walk away. So providers look at whether the contract survives a sale and whether the guarantee survives with it.
Here is how a neocloud can answer those worries before they become deal killers:
- Show your funding. Audited or reviewed financials, current cash, debt facilities and recent raises.
- Show your demand. Customer contracts or offtake agreements with terms, counterparties and termination rights.
- Show your hardware. Purchase orders, delivery schedules and how the GPUs are financed.
- Offer support. A guarantee, letter of credit or deposit that fits the size of the build.
- Make the space reusable. Where possible, design the build so another tenant could use it later.
- Address a sale. Agree in advance on what happens to the contract if you are acquired.
What questions should a neocloud ask before signing?
- Is the capacity energized today, and if not, what is the utility-committed energization date?
- Can you show a signed utility agreement or letter for this MW?
- What is the contractual ready-for-service date for each phase?
- What remedies apply if delivery is late?
- What is the maximum kW per rack, and how is power delivered to the cabinet?
- Is liquid cooling supported today, and who owns the CDUs and secondary loop?
- What NRC applies, and which items are custom to our hardware?
- How is MRC calculated, and does billing start before we can move in?
- What deposit or credit support do you need, and can it step down over time?
- What happens to the contract if we are acquired?
What belongs on a neocloud colocation checklist?
- Cluster plan in kW per rack and MW per phase
- Cooling method chosen (air, rear door or direct liquid)
- Redundancy requirement defined
- GPU delivery schedule matched to a power ramp
- Financial statements ready to share under NDA
- Funding evidence and debt facilities documented
- Customer or offtake contracts summarized with terms
- Credit support option identified (guarantee, letter of credit or deposit)
- Utility and energization proof requested from each provider
- Ready-for-service dates and late delivery remedies in the draft
- Assignment and change of control language reviewed
- Early termination exposure modeled
- Quotes compared on the same assumptions
To score facilities on rack density, liquid cooling, CDUs and floor loading side by side, use our free data center checklist. For the high-density checks alone, from power ramps to CDU ownership, download our AI and high-density colocation checklist.
Frequently asked questions about neocloud colocation
What is neocloud colocation?
It is a neocloud leasing space, power and cooling in a third-party data center to host the GPU clusters it rents to customers. The neocloud owns and runs the hardware. The provider supplies the building, power, cooling and security.
How much power does a neocloud rack need?
It depends on the hardware. An 8-GPU server such as a DGX B200 lists 14.3 kW maximum. Air-cooled GPU racks commonly land around 15 to 40 kW. Rack-scale liquid-cooled systems are designed around 120 kW of cooling capacity per rack.
Can a neocloud get colocation without investment grade credit?
Yes, but expect more questions and more security. Providers commonly ask for financials, deposits, a guarantee or a letter of credit. They will also look closely at your customer contracts.
What is a credit wrapper in a colocation deal?
It is credit support from a stronger party, such as a parent guarantee, a bank letter of credit or an assigned customer contract. It lowers the provider's risk if the tenant cannot pay.
How do I know a provider's capacity is real?
Ask for a signed utility agreement or letter, the energization status of the substation and a contractual ready-for-service date with remedies if it slips. Then walk the site.
Why do providers worry about neocloud tenants going out of business?
A custom high-density hall is hard to re-lease quickly. If a neocloud fails or is acquired and leaves, the provider faces vacancy and unpaid charges. Strong financials, credit support and clear assignment terms ease that worry.
More in GPU and AI Colocation Articles and Guides
Compare facilities: High-density data centers
Comparing data centers?
Send us your requirements. We'll shortlist the providers that fit and get you pricing.